§157.08. Applicability of subpart B. — Inbound Citations

33 C.F.R. § 157.08

Cited by 15 regulations in release Current.

Citations to §157.08(a)

Citations to §157.08(b)

Citations to §157.08(c)

Citations to §157.08(e)

Citations to §157.08(f)

Citations to §157.08(g)

Citations to §157.08(h)

Citations to §157.08(i)

Citations to §157.08(j)

Citations to §157.08(k)

Citations to §157.08(l)

Citations to §157.08(m)

Citations to §157.08(n)

  • (a) With the exceptions stated in § 157.08(n), this section applies to a tank vessel—
    (1) For which the building contract is awarded after June 30, 1990;
    (2) That is delivered after December 31, 1993;
    (3) That undergoes a major conversion for which;
    (i) The contract is awarded after June 30, 1990; or
    (ii) Conversion is completed after December 31, 1993; or
    (4) That is otherwise required to have a double hull by 46 U.S.C. 3703a(c).

Citations to §157.08(o)

  • (h) Every oil tanker of 150 gross tons or more delivered on or after January 1, 2010, as defined in § 157.08(o), that has installed a sea chest that is permanently connected to the cargo pipeline system, must be equipped with both a sea chest valve and an inboard isolation valve. The sea chest must be able to be isolated from the cargo piping system by use of a positive means while the tanker is loading, transporting, or discharging cargo. This positive means must be is installed in the pipeline in such a way as to prevent, under all circumstances, the section of pipe between the sea chest valve and the inboard valve from being filled with cargo.