§156.170. Equipment tests and inspections. — Inbound Citations
33 C.F.R. § 156.170
Statutory Authority
Cited by 12 regulations in release Current.
Citations to 33 U.S.C. § 156.170 as a whole
-
-
(16) The maximum allowable working pressure (MAWP) of each loading arm, transfer pipe system, and hose assembly required to be tested by § 156.170 of this chapter, including the maximum relief valve setting (or maximum system pressure when relief valves are not provided) for each transfer system;
-
(3) Date of the latest test required by 33 CFR 156.170.
-
(c) The date and result of the most recent test or examination of each item tested or examined under § 156.170 of this chapter;
-
(b) The date and result of the most recent test and inspection of each item tested or inspected as required by § 156.170 of this chapter;
Citations to §156.170(c)(4)
-
(2) A physical description of the facility including a plan and/or plans, maps, drawings, aerial photographs or diagrams, showing the boundaries of the facility subject to Coast Guard jurisdiction, mooring areas, transfer locations, control stations, wharfs, the extent and scope of the piping subject to the tests required by § 156.170(c)(4) of this chapter, and the locations of safety equipment. For mobile facilities, a physical description of the facility;
Citations to §156.170(g)
-
(2) Procedures for equipment and instrumentation testing required by 33 CFR 156.170(g).
-
(r) VCS equipment and instrumentation must be tested in compliance with 33 CFR 156.170(g) or (i), with the COTP or designated representative invited to observe these tests. The test procedure and a checklist must be approved by the certifying entity during the initial certification of the system and incorporated into the facility operations manual.
-
(e) VCS equipment and instrumentation must be tested in compliance with 33 CFR 156.170(g) or (i), with the COTP or designated representative invited to observe these tests. The test procedure and a checklist must be approved by the certifying entity during the initial certification of the system and incorporated into the facility operations manual.
-
(4) The VCS description required by paragraph (b)(1) of this section must include all test procedures and a checklist for use during the testing of the VCS required by 33 CFR 156.170(g). The test procedures must specify—(i) All tests required for initial certification under 33 CFR 154.2022(d);(ii) All components that are to be tested; and
Citations to §156.170(i)
-
(r) VCS equipment and instrumentation must be tested in compliance with 33 CFR 156.170(g) or (i), with the COTP or designated representative invited to observe these tests. The test procedure and a checklist must be approved by the certifying entity during the initial certification of the system and incorporated into the facility operations manual.
-
(e) VCS equipment and instrumentation must be tested in compliance with 33 CFR 156.170(g) or (i), with the COTP or designated representative invited to observe these tests. The test procedure and a checklist must be approved by the certifying entity during the initial certification of the system and incorporated into the facility operations manual.