§149.615. What construction drawings and specifications are required?
33 C.F.R. § 149.615
To show compliance with the Act and this subchapter, the licensee must submit to the Commandant (CG-5P) or accepted Certifying Entity (CE) at least three copies of:
Each construction drawing and specification; and
Each revision to a drawing and specification.
Each drawing, specification, and revision under paragraph (a) of this section must bear the seal, or a facsimile imprint of the seal, of the registered professional engineer responsible for the accuracy and adequacy of the material.
Each drawing must identify the baseline design standard used as the basis for design.
Notes, amendments, and revision history
Amendments
[USCG-1998-3884, 71 FR 57651, Sept. 29, 2006, as amended by USCG-2013-0397, 78 FR 39180, July 1, 2013]
Authority
Authority: 33 U.S.C. 1504, 1509; DHS Delegation No. 00170.1, Revision No. 01.4.
Source
Source: USCG-1998-3884, 71 FR 57651, Sept. 29, 2006, unless otherwise noted.
Amendments
[USCG-1998-3884, 71 FR 57651, Sept. 29, 2006, as amended by USCG-2013-0397, 78 FR 39180, July 1, 2013]