§127.609. Dry chemical systems.
33 C.F.R. § 127.609
Each marine transfer area for LNG must have a dry chemical system that provides at least two dry chemical discharges to the area surrounding the loading arms, one of which must be—
From a monitor; and
Actuated and, except for pre-aimed monitors, controlled from a location other than the monitor location.
The dry chemical system must have the capacity to supply simultaneously or sequentially each hose or monitor in the system for 45 seconds.
Each dry chemical hose station must have at least one length of hose that—
Is on a hose rack or reel; and
Has a nozzle with a valve that starts and stops the flow of dry chemical.
Notes, amendments, and revision history
Amendments
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995]
Authority
Authority: 33 U.S.C. 1504(j)(2); 46 U.S.C. 70011 and 70034; 46 U.S.C. Chapter 701; DHS Delegation No. 00170.1, Revision No. 01.2, paragraph (II)(92)(a).
Source
Source: CGD 78-038, 53 FR 3376, Feb. 7, 1988, unless otherwise noted.
Amendments
[CGD 78-038, 53 FR 3376, Feb. 7, 1988, as amended at CGD 88-049, 60 FR 39796, Aug. 3, 1995]