§117.953. Brazos River (Diversion Channel).
33 C.F.R. § 117.953
The draw of the S36 highway bridge, mile 4.4 at Freeport, shall open on signal if at least 12 hours notice is given.
The draw of the Union Pacific railroad bridge, mile 22.6 at Brazoria, need not be opened for the passage of vessels.
Notes, amendments, and revision history
Authority
Authority: 33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No. 00170.1, Revision No. 01.4.
Source
Source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.