§117.734. Navesink River (Swimming River).
33 C.F.R. § 117.734
The Oceanic Bridge, mile 4.5, shall open on signal; except that, from December 1 through March 31, the draw shall open on signal, if at least a twenty-four hour notice is given by calling the number posted at the bridge. The owner of this bridge shall provide and keep in good legible condition clearance gauges with figures not less than eight inches high, designed, installed and maintained according to the provisions of § 118.160 of this chapter.
Notes, amendments, and revision history
Amendments
[CGD01-99-075, 64 FR 71655, Dec. 22, 1999]
Authority
Authority: 33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No. 00170.1, Revision No. 01.4.
Source
Source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.
Amendments
[CGD01-99-075, 64 FR 71655, Dec. 22, 1999]