§117.155. Eureka Slough.
33 C.F.R. § 117.155
The drawspan for the Northwestern Pacific Railroad Authority Drawbridge, mile 0.3 at Eureka, need not be opened for the passage of vessels. The owner or agency controlling the drawbridge must restore the drawspan to full operation within six months of notification from the District Commander.
Notes, amendments, and revision history
Amendments
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]
Authority
Authority: 33 U.S.C. 499; 33 CFR 1.05-1; and DHS Delegation No. 00170.1, Revision No. 01.4.
Source
Source: CGD 82-025, 49 FR 17452, Apr. 24, 1984, unless otherwise noted.
Amendments
[USCG-2001-10881, 71 FR 70309, Dec. 4, 2006]