US Codex
C.F.R.
Browse by date
Notes

§767.11. Content of permit holder's final report. — Inbound Citations

32 C.F.R. § 767.11

Cited by 2 regulations in release Current.

Citations to 32 U.S.C. § 767.11 as a whole

  • (f) Persons carrying out official NHHC duties under the direction of the NHHC Director, or his/her designee, or conducting activities at the direction of or in coordination with the NHHC as recognized through express written permission by the NHHC Director, or his/her designee, need not follow the permit application procedures set forth in this section and §§ 767.7 and 767.9 to 767.12 if those duties or activities are associated with the management of sunken military craft or terrestrial military craft. Where appropriate, such persons will coordinate with Federal Land Managers, the Bureau of Ocean Energy Management, State Historic Preservation Offices, or state land or resource managers, as applicable, prior to engaging in the aforementioned activities. The NHHC Director, or his/her designee, shall ensure that the provisions of paragraph (d) of this section and §§ 767.8 and 767.11 have been met by other documented means and that such documents and all resulting data will be archived within the NHHC.
  • (g) The permit holder shall prepare and submit a final report as detailed in § 767.11, summarizing the results of the permitted activity to the NHHC, and any applicable SHPO, THPO, federal or state land or resource manager, or foreign government official within an appropriate time frame as specified in the permit. Failure to submit a final report within the specified time-frame will be considered a permit violation. If the final report is not due to be submitted within two years of commencement of a permitted activity, interim reports must be filed biennially, with the first interim report submitted within two years of commencement of the activity. The interim report must include information required by § 767.11 to the maximum extent possible, and an account of both the progress that has been achieved and the objectives remaining to be accomplished. The NHHC shall review interim and final reports for thoroughness, accuracy, and quality and shall inform the permit holder of their formal acceptance in writing.