Part 816 — Permanent Program Performance Standards—surface Mining Activities
- §816.1 Scope.
- §816.2 Objectives.
- §816.10 Information collection.
- §816.11 Signs and markers.
- §816.13 Casing and sealing of drilled holes: General requirements.
- §816.14 Casing and sealing of drilled holes: Temporary.
- §816.15 Casing and sealing of drilled holes: Permanent.
- §816.22 Topsoil and subsoil.
- §816.41 Hydrologic-balance protection.
- §816.42 Hydrologic balance: Water quality standards and effluent limitations.
- §816.43 Diversions.
- §816.45 Hydrologic balance: Sediment control measures.
- §816.46 Hydrologic balance: Siltation structures.
- §816.47 Hydrologic balance: Discharge structures.
- §816.49 Impoundments.
- §816.56 Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities.
- §816.57 Hydrologic balance: Stream buffer zones.
- §816.59 Coal recovery.
- §816.61 Use of explosives: General requirements.
- §816.62 Use of explosives: Preblasting survey.
- §816.64 Use of explosives: Blasting schedule.
- §816.66 Use of explosives: Blasting signs, warnings, and access control.
- §816.67 Use of explosives: Control of adverse effects.
- §816.68 Use of explosives: Records of blasting operations.
- §816.71 Disposal of excess spoil: General requirements.
- §816.72 Disposal of excess spoil: Valley fills/head-of-hollow fills.
- §816.73 Disposal of excess spoil: Durable rock fills.
- §816.74 Disposal of excess spoil: Preexisting benches.
- §816.79 Protection of underground mining.
- §816.81 Coal mine waste: General requirements.
- §816.83 Coal mine waste: Refuse piles.
- §816.84 Coal mine waste: Impounding structures.
- §816.87 Coal mine waste: Burning and burned waste utilization.
- §816.89 Disposal of noncoal mine wastes.
- §816.95 Stabilization of surface areas.
- §816.97 Protection of fish, wildlife, and related environmental values.
- §816.99 Slides and other damage.
- §816.100 Contemporaneous reclamation.
- §816.101 Reserved
- §816.102 Backfilling and grading: General requirements.
- §816.104 Backfilling and grading: Thin overburden.
- §816.105 Backfilling and grading: Thick overburden.
- §816.106 Backfilling and grading: Previously mined areas.
- §816.107 Backfilling and grading: Steep slopes.
- §816.111 Revegetation: General requirements.
- §816.113 Revegetation: Timing.
- §816.114 Revegetation: Mulching and other soil stabilizing practices.
- §816.116 Revegetation: Standards for success.
- §816.131 Cessation of operations: Temporary.
- §816.132 Cessation of operations: Permanent.
- §816.133 Postmining land use.
- §816.150 Roads: general.
- §816.151 Primary roads.
- §816.180 Utility installations.
- §816.181 Support facilities.
- §816.200 Interpretative rules related to general performance standards.