Part 784 — Underground Mining Permit Applications—minimum Requirements for Reclamation and Operation Plan
- §784.1 Scope.
- §784.2 Objectives.
- §784.4 Responsibilities.
- §784.10 Information collection.
- §784.11 Operation plan: General requirements.
- §784.12 Operation plan: Existing structures.
- §784.13 Reclamation plan: General requirements.
- §784.14 Hydrologic information.
- §784.15 Reclamation plan: Land use information.
- §784.16 Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.
- §784.17 Protection of publicly owned parks and historic places.
- §784.18 Relocation or use of public roads.
- §784.19 Underground development waste.
- §784.20 Subsidence control plan.
- §784.21 Fish and wildlife information.
- §784.22 Geologic information.
- §784.23 Operation plan: Maps and plans.
- §784.24 Road systems.
- §784.25 Return of coal processing waste to abandoned underground workings.
- §784.26 Air pollution control plan.
- §784.29 Diversions.
- §784.30 Support facilities.
- §784.200 Interpretive rules related to General Performance Standards.