Part 780 — Surface Mining Permit Applications—minimum Requirement for Reclamation and Operation Plan
- §780.1 Scope.
- §780.2 Objectives.
- §780.4 Responsibilities.
- §780.10 Information collection.
- §780.11 Operation plan: General requirements.
- §780.12 Operation plan: Existing structures.
- §780.13 Operation plan: Blasting.
- §780.14 Operation plan: Maps and plans.
- §780.15 Air pollution control plan.
- §780.16 Fish and wildlife information.
- §780.18 Reclamation plan: General requirements.
- §780.21 Hydrologic information.
- §780.22 Geologic information.
- §780.23 Reclamation plan: Land use information.
- §780.25 Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments.
- §780.27 Reclamation plan: Surface mining near underground mining.
- §780.28 Reserved
- §780.29 Diversions.
- §780.31 Protection of publicly owned parks and historic places.
- §780.33 Relocation or use of public roads.
- §780.35 Disposal of excess spoil.
- §780.37 Road systems.
- §780.38 Support facilities.