US Codex
C.F.R.
Browse by date
Notes

30 C.F.R. §§ 817.81–817.84

3 sections in range

§817.81. Coal mine waste: General requirements.

30 C.F.R. § 817.81

(a)
General. All coal mine waste disposed of in an area other than the mine workings or excavations shall be placed in new or existing disposal areas within a permit area, which are approved by the regulatory authority for this purpose. Coal mine waste shall be hauled or conveyed and placed for final placement in a controlled manner to—
(1)
Minimize adverse effects of leachate and surface-water runoff on surface and ground water quality and quantity;
(2)
Ensure mass stability and prevent mass movement during and after construction;
(3)
Ensure that the final disposal facility is suitable for reclamation and revegetation compatible with the natural surroundings and the approved postmining land use;
(4)
Not create a public hazard; and
(5)
Prevent combustion.
(b)
Coal mine waste materials from activities located outside a permit area may be disposed of in the permit area only if approved by the regulatory authority. Approval shall be based upon a showing that such disposal will be in accordance with the standards of this section.
(c)
Design certification.
(1)
The disposal facility shall be designed using current, prudent engineering practices and shall meet any design criteria established by the regulatory authority. A qualified registered professional engineer, experienced in the design of similar earth and waste structures, shall certify the design of the disposal facility.
(2)
The disposal facility shall be designed to attain a minimum long-term static safety factor of 1.5. The foundation and abutments must be stable under all conditions of construction.
(d)
Foundation. Sufficient foundation investigations, as well as any necessary laboratory testing of foundation material, shall be performed in order to determine the design requirements for foundation stability. The analyses of the foundation conditions shall take into consideration the effect of underground mine workings, if any, upon the stability of the disposal facility.
(e)
Emergency procedures. If any examination or inspection discloses that a potential hazard exists, the regulatory authority shall be informed promptly of the finding and of the emergency procedures formulated for public protection and remedial action. If adequate procedures cannot be formulated or implemented, the regulatory authority shall be notified immediately. The regulatory authority shall then notify the appropriate agencies that other emergency procedures are required to protect the public.
(f)
Underground disposal. Coal mine waste may be disposed of in underground mine workings, but only in accordance with a plan approved by the regulatory authority and MSHA under § 784.25 of this chapter.
Notes, amendments, and revision history

Amendments

[48 FR 44030, Sept. 26, 1983, as amended at 56 FR 65636, Dec. 17, 1991; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]

Authority

Authority: 30 U.S.C. 1201 et seq.

Source

Source: 44 FR 15422, Mar. 13, 1979, unless otherwise noted.

Amendments

[48 FR 44030, Sept. 26, 1983, as amended at 56 FR 65636, Dec. 17, 1991; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]

§817.83. Coal mine waste: Refuse piles.

30 C.F.R. § 817.83

Refuse piles shall meet the requirements of § 817.81, the additional requirements of this section, and the requirements of §§ 77.214 and 77.215 of this title.
(a)
Drainage control.
(1)
If the disposal area contains springs, natural or manmade water courses, or wet weather seeps, the design shall include diversions and underdrains as necessary to control erosion, prevent water infiltration into the disposal facility and ensure stability.
(2)
Uncontrolled surface drainage may not be diverted over the outslope of the refuse pile. Runoff from areas above the refuse pile and runoff from the surface of the refuse pile shall be diverted into stabilized diversion channels designed to meet the requirements of § 817.43 to safely pass the runoff from a 100-year, 6-hour precipitation event. Runoff diverted from undisturbed areas need not be commingled with runoff from the surface of the refuse pile.
(3)
Underdrains shall comply with the requirements of § 817.71(f)(3).
(b)
Surface area stabilization. Slope protection shall be provided to minimize surface erosion at the site. All disturbed areas, including diversion channels that are not riprapped or otherwise protected, shall be revegetated upon completion of construction.
(c)
Placement.
(1)
All vegetative and organic materials shall be removed from the disposal area prior to placement of coal mine waste. Topsoil shall be removed, segregated and stored or redistributed in accordance with § 817.22. If approved by the regulatory authority, organic material may be used as mulch or may be included in the topsoil to control erosion, promote growth of vegetation or increase the moisture retention of the soil.
(2)
The final configuration of the refuse pile shall be suitable for the approved postmining land use. Terraces may be constructed on the outslope of the refuse pile if required for stability, control of erosion, conservation of soil moisture, or facilitation of the approved postmining land use. The grade of the outslope between terrace benches shall not be steeper than 2h:1v (50 percent).
(3)
No permanent impoundments shall be allowed on the completed refuse pile. Small depressions may be allowed by the regulatory authority if they are needed to retain moisture, minimize erosion, create and enhance wildlife habitat, or assist revegetation, and if they are not incompatible with stability of the refuse pile.
(4)
Following final grading of the refuse pile, the coal mine waste shall be covered with a minimum of 4 feet of the best available, nontoxic and noncombustible material, in a manner that does not impede drainage from the underdrains. The regulatory authority may allow less than 4 feet of cover material based on physical and chemical analyses which show that the requirements of §§ 817.111 through 817.116 will be met.
(d)
Inspections. A qualified registered professional engineer, or other qualified professional specialist under the direction of the professional engineer, shall inspect the refuse pile during construction. The professional engineer or specialist shall be experienced in the construction of similar earth and waste structures.
(1)
Such inspection shall be made at least quarterly throughout construction and during critical construction periods. Critical construction periods shall include at a minimum: (i) Foundation preparation including the removal of all organic material and topsoil; (ii) placement of underdrains and protective filter systems; (iii) installation of final surface drainage systems; and (iv) the final graded and revegetated facility. Regular inspections by the engineer or specialist shall also be conducted during placement and compaction of coal mine waste materials. More frequent inspections shall be conducted if a danger of harm exists to the public health and safety or the environment. Inspections shall continue until the refuse pile has been finally graded and revegetated or until a later time as required by the regulatory authority.
(2)
The qualified registered professional engineer shall provide a certified report to the regulatory authority promptly after each inspection that the refuse pile has been constructed and maintained as designed and in accordance with the approved plan and this chapter. The report shall include appearances of instability, structural weakness, and other hazardous conditions.
(3)
The certified report on the drainage system and protective filters shall include color photographs taken during and after construction, but before underdrains are covered with coal mine waste. If the underdrain system is constructed in phases, each phase shall be certified separately. The photographs accompanying each certified report shall be taken in adequate size and number with enough terrain or other physical features of the site shown to provide a relative scale to the photographs and to specifically and clearly identify the site.
(4)
A copy of each inspection report shall be retained at or near the minesite.
Notes, amendments, and revision history

Amendments

[48 FR 44030, Sept. 26, 1983, as amended at 56 FR 65636, Dec. 17, 1991; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]

Authority

Authority: 30 U.S.C. 1201 et seq.

Source

Source: 44 FR 15422, Mar. 13, 1979, unless otherwise noted.

Amendments

[48 FR 44030, Sept. 26, 1983, as amended at 56 FR 65636, Dec. 17, 1991; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]

§817.84. Coal mine waste: Impounding structures.

30 C.F.R. § 817.84

New and existing impounding structures constructed of coal mine waste or intended to impound coal mine waste shall meet the requirements of § 817.81.
(a)
Coal mine waste shall not be used for construction of impounding structures unless it has been demonstrated to the regulatory authority that the stability of such a structure conforms to the requirements of this part and the use of coal mine waste will not have a detrimental effect on downstream water quality or the environment due to acid seepage through the impounding structure. The stability of the structure and the potential impact of acid mine seepage through the impounding structure and shall be discussed in detail in the design plan submitted to the regulatory authority in accordance with § 780.25 of this chapter.
(b)
(1)
Each impounding structure constructed of coal mine waste or intended to impound coal mine waste shall be designed, constructed and maintained in accordance with § 817.49 (a) and (c). Such structures may not be retained permanently as part of the approved postmining land use.
(2)
Each impounding structure constructed of coal mine waste or intended to impound coal mine waste that meets the criteria of § 77.216(a) of this title shall have sufficient spillway capacity to safely pass, adequate storage capacity to safely contain, or a combination of storage capacity and spillway capacity to safely control, the probable maximum precipitation of a 6-hour precipitation event, or greater event as specified by the regulatory authority.
(c)
Spillways and outlet works shall be designed to provide adequate protection against erosion and corrosion. Inlets shall be protected against blockage.
(d)
Drainage control. Runoff from areas above the disposal facility or runoff from the surface of the facility that may cause instability or erosion of the impounding structure shall be diverted into stabilized diversion channels designed to meet the requirements of § 817.43 and designed to safely pass the runoff from a 100-year, 6-hour design precipitation event.
(e)
Impounding structures constructed of or impounding coal mine waste shall be designed so that at least 90 percent of the water stored during the design precipitation event can be removed within a 10-day period.
(f)
For an impounding structure constructed of or impounding coal mine waste, at least 90 percent of the water stored during the design precipitation event shall be removed within the 10-day period following the design precipitation event.
Notes, amendments, and revision history

Amendments

[48 FR 44031, Sept. 26, 1983, as amended at 53 FR 43608, Oct. 27, 1988; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]

Authority

Authority: 30 U.S.C. 1201 et seq.

Source

Source: 44 FR 15422, Mar. 13, 1979, unless otherwise noted.

Amendments

[48 FR 44031, Sept. 26, 1983, as amended at 53 FR 43608, Oct. 27, 1988; 81 FR 93418, Dec. 20, 2016; 82 FR 54999, Nov. 17, 2017]