US Codex
C.F.R.
Browse by date
Notes

§75.371. Mine ventilation plan; contents. — Inbound Citations

30 C.F.R. § 75.371

Cited by 10 regulations in release Current.

Citations to 30 U.S.C. § 75.371 as a whole

  • (7) A proposed mine ventilation plan containing the information specified in §§ 75.371 and 75.372;
  • (k) As of November 25, 1997 the ventilating air quantity required where diesel-powered equipment is operated shall meet the requirements of paragraphs (f) through (j) of this section. Mine operators utilizing diesel-powered equipment in underground coal mines shall submit to the appropriate MSHA district manager a revised ventilation plan or appropriate amendments to the existing plan, in accordance with § 75.371, which implement the requirements of paragraphs (f) through (j) of this section.
  • (1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.
  • (2) In addition to the informational requirements of this section the map may also be used to depict and explain plan contents that are required in § 75.371. Information shown on the map to satisfy the requirements of § 75.371 shall be subject to approval by the district manager.

Citations to §75.371(f)

  • (c) Except for routine mining-through operations that are part of a retreat section ventilation system approved in accordance with § 75.371(f) and (x), the following provisions shall apply:
    (1) Before and during mining-through operations, a certified person shall perform air quality tests at intervals and at locations necessary to protect the safety of the miners.
    (2) During mining-through operations, only persons involved in these operations shall be permitted in the mine; and
    (3) After mining-through, a certified person shall determine that the affected areas are safe before any persons enter the underground areas of the mine.

Citations to §75.371(hh)

Citations to §75.371(nn)

Citations to §75.371(t)

  • The following definitions apply in this part.
  • (2) DAs identified by the operator under § 75.371(t) of this chapter shall be sampled quarterly with an approved CMDPSU as required by this part, unless the operator notifies the District Manager in writing that only an approved CPDM will be used for all DA sampling at the mine. The notification must be received at least 90 days before the beginning of the quarter in which CPDMs will be used to collect the DA samples.

Citations to §75.371(x)

  • (c) Except for routine mining-through operations that are part of a retreat section ventilation system approved in accordance with § 75.371(f) and (x), the following provisions shall apply:
    (1) Before and during mining-through operations, a certified person shall perform air quality tests at intervals and at locations necessary to protect the safety of the miners.
    (2) During mining-through operations, only persons involved in these operations shall be permitted in the mine; and
    (3) After mining-through, a certified person shall determine that the affected areas are safe before any persons enter the underground areas of the mine.