§57.12028. Testing grounding systems.
30 C.F.R. § 57.12028
Continuity and resistance of grounding systems shall be tested immediately after installation, repair, and modification; and annually thereafter. A record of the resistance measured during the most recent test shall be made available on a request by the Secretary or his duly authorized representative.
Notes, amendments, and revision history
Authority
Authority: 30 U.S.C. 811.
Source
Source: 50 FR 4082, Jan. 29, 1985, unless otherwise noted.