§550.200. Definitions.
30 C.F.R. § 550.200
BOEM means Bureau of Ocean Energy Management.
BSEE means Bureau of Safety and Environmental Enforcement.
CID means Conservation Information Document.
CZMA means Coastal Zone Management Act.
DOCD means Development Operations Coordination Document.
DPP means Development and Production Plan.
DWOP means Deepwater Operations Plan.
EIA means Environmental Impact Analysis.
EP means Exploration Plan.
IOP means Integrated Operations Plan.
NPDES means National Pollutant Discharge Elimination System.
NTL means Notice to Lessees and Operators.
OCS means Outer Continental Shelf.
Modification means a change required by the Regional Supervisor to an EP, DPP, or DOCD (see § 550.233(b)(2) and § 550.270(b)(2)) that is pending before BOEM for a decision because the OCS plan is inconsistent with applicable requirements.
New or unusual technology means equipment or procedures that:
Offshore vehicle means a vehicle that is capable of being driven on ice.
Resubmitted OCS plan means an EP, DPP, or DOCD that contains changes you make to an OCS plan that BOEM has disapproved (see §§ 550.234(b), 550.272(a), and 550.273(b)).
Revised OCS plan means an EP, DPP, or DOCD that proposes changes to an approved OCS plan, such as those in the location of a well or platform, type of drilling unit, or location of the onshore support base (see § 550.283(a)).
Supplemental OCS plan means an EP, DPP, or DOCD that proposes the addition to an approved OCS plan of an activity that requires approval of an application or permit (see § 550.283(b)).
Notes, amendments, and revision history
Amendments
[76 FR 64623, Oct. 18, 2011, as amended at 81 FR 46565, July 15, 2016]
Authority
Authority: 30 U.S.C. 1751; 31 U.S.C. 9701; 43 U.S.C. 1334.
Source
Source: 76 FR 64623, Oct. 18, 2011, unless otherwise noted.
Amendments
[76 FR 64623, Oct. 18, 2011, as amended at 81 FR 46565, July 15, 2016]