§285.714. What records relating to FDRs, FIRs, and Project Modification and Repair Reports must I keep? — Inbound Citations
30 C.F.R. § 285.714
Statutory Authority
Cited by 4 regulations in release Current.
Citations to §285.714(c)
-
(c) You must submit your FDR to BSEE pursuant to § 285.110 and provide the location of records, as required in § 285.714(c).
-
(c) You must provide the location of records, as required in § 285.714(c).
-
(b) The report must also identify the location of all records pertaining to the major repairs or major modifications, as required in § 285.714(c).
-
(5) Certify in Project Verification Reports that project components are fabricated and installed in accordance with accepted engineering practices and to a nationally or internationally recognized quality assurance standard or to an equivalent alternate means of quality assurance considered on a case-by-case basis, your BOEM-approved SAP, COP, or GAP (as applicable), and your FIR. If multiple CVAs are involved in your project, the general project CVA must submit the final report containing such certification for the project. The Project Verification Report must identify the location of all records pertaining to facility fabrication and installation as required in § 285.714(c);