§285.110. How do I submit applications, reports, or notices required by this part? — Inbound Citations

30 C.F.R. § 285.110

Cited by 5 regulations in release Current.

Citations to 30 U.S.C. § 285.110 as a whole

  • (2) You must furnish an electronic copy of the study and results to BSEE pursuant to § 285.110;
  • (c) You must submit your FDR to BSEE pursuant to § 285.110 and provide the location of records, as required in § 285.714(c).
  • (b) You must submit your FIR to BSEE pursuant to § 285.110.
  • (b) For each report required by this subpart, the CVA or project engineer must submit the final report to BSEE pursuant to § 285.110. In each report, the CVA or project engineer must:
    (1) Give details of how, by whom, and when the CVA or project engineer activities were conducted;
    (2) Describe the CVA's or project engineer's activities during the verification process;
    (3) Summarize the CVA's or project engineer's findings; and
    (5) Summarize any issues with the design and any incidents during facility fabrication and installation, or Critical Safety System and Equipment commissioning, and how those issues were resolved.
  • (b) You must regularly demonstrate to BSEE that your SMS is being implemented effectively by submitting the following to BSEE in accordance with § 285.110:
    (1) By March 31st of each year, summarize safety and work hour performance data for the prior calendar year in which you conducted site assessment, construction, operations, or decommissioning activities in accordance with your lease terms, using a form available on the BSEE website; and
    (2) Once every 3 years and upon BSEE's request, provide a report to BSEE summarizing the results of your most recent SMS audit, corrective actions implemented or being implemented as a result of that audit, and an updated description of your SMS highlighting changes that were made since the last such submission to BSEE.