§250.760. What are the snubbing requirements?

30 C.F.R. § 250.760

(a)
For snubbing operations, you must follow the applicable requirements of this subpart and have the following minimum BOP-system components:
(1)
One set of pipe rams hydraulically operated,
(2)
Two sets of stripper-type pipe rams hydraulically operated with spacer spool,
(3)
An inside BOP or a spring-loaded, back-pressure safety valve in the open position located on the rig floor, and
(4)
An essentially full-opening, work-string safety valve in the open position must be maintained on the rig floor at all times and a wrench to fit the work-string safety valve must be readily available.
(5)
Proper connections must be readily available for inserting valves in the work string.
(b)
Test the snubbing unit in accordance with § 250.737(a), (b), and (c).
Notes, amendments, and revision history

Amendments

[84 FR 21984, May 15, 2019]

Source

Source: 81 FR 26022, Apr. 29, 2016, unless otherwise noted.

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Amendments

[84 FR 21984, May 15, 2019]