US Codex
C.F.R.
Browse by date
Notes

§250.525. When am I required to take action from my casing diagnostic test?

30 C.F.R. § 250.525

You must take action if you have any of the following conditions:
(a)
Any fixed platform well with a casing pressure exceeding its maximum allowable wellhead operating pressure (MAWOP);
(b)
Any fixed platform well with a casing pressure that is greater than 100 psig and that cannot bleed to 0 psig through a 1/2-inch needle valve within 24 hours, or is not bled to 0 psig during a casing diagnostic test;
(c)
Any well that has demonstrated tubing/casing, tubing/riser, casing/casing, riser/casing, or riser/riser communication;
(d)
Any well that has sustained casing pressure (SCP) and is bled down to prevent it from exceeding its MAWOP, except during initial startup operations described in § 250.522;
(e)
Any hybrid well with casing or riser pressure exceeding 100 psig; or
(f)
Any subsea well with a casing pressure 100 psig greater than the external hydrostatic pressure at the subsea wellhead.
Notes, amendments, and revision history

Amendments

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012; 84 FR 21976, May 15, 2019]

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

Amendments

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012; 84 FR 21976, May 15, 2019]