§250.238. What well or completions information must my DWOP include?
30 C.F.R. § 250.238
You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):
A description and schematic of the typical wellbore, casing, and completion;
Information concerning the drilling and completion systems; and
Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.
Notes, amendments, and revision history
Source
Source: 89 FR 71112, Aug. 30, 2024, unless otherwise noted.
Authority
Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.
Source
Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.