US Codex
C.F.R.
Browse by date
Notes

§250.238. What well or completions information must my DWOP include?

30 C.F.R. § 250.238

You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):
(a)
A description and schematic of the typical wellbore, casing, and completion;
(b)
Information concerning the drilling and completion systems; and
(c)
Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.
Notes, amendments, and revision history

Source

Source: 89 FR 71112, Aug. 30, 2024, unless otherwise noted.

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.