30 C.F.R. §§ 250.1740–250.1742

3 sections in range

§250.1740. How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?

30 C.F.R. § 250.1740

Within 60 days after you permanently plug a well or remove a platform or other facility, you must verify that the site is clear of obstructions by using one of the following methods:
(a)
For a well site, you must either:
(1)
Drag a trawl over the site;
(2)
Scan across the location using sonar equipment;
(3)
Inspect the site using a diver;
(4)
Videotape the site using a camera on a remotely operated vehicle (ROV); or
(5)
Use another method approved by the District Manager if the particular site conditions warrant.
(b)
For a platform or other facility site in water depths less than 300 feet, you must drag a trawl over the site.
(c)
For a platform or other facility site in water depths 300 feet or more, you must either:
(1)
Drag a trawl over the site;
(2)
Scan across the site using sonar equipment; or
(3)
Use another method approved by the Regional Supervisor if the particular site conditions warrant.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§250.1741. If I drag a trawl across a site, what requirements must I meet?

30 C.F.R. § 250.1741

If you drag a trawl across the site in accordance with § 250.1740, you must meet all of the requirements of this section.
(a)
You must drag the trawl in a grid-like pattern as shown in the following table:
(b)
You must trawl 100 percent of the limits described in paragraph (a) of this section in two directions.
(c)
You must mark the area to be cleared as a hazard to navigation according to USCG requirements until you complete the site clearance procedures.
(d)
You must use a trawling vessel equipped with a calibrated navigational positioning system capable of providing position accuracy of ±30 feet.
(e)
You must use a trawling net that is representative of those used in the commercial fishing industry (one that has a net strength equal or greater than that provided by No. 18 twine).
(f)
You must ensure that you trawl no closer than 300 feet from a shipwreck, and 500 feet from a sensitive biological feature.
(g)
If you trawl near an active pipeline, you must meet the requirements in the following table:
(h)
You must ensure that any trawling contractor you may use:
(1)
Has no corporate or other financial ties to you; and
(2)
Has a valid commercial trawling license for both the vessel and its captain.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§250.1742. What other methods can I use to verify that a site is clear?

30 C.F.R. § 250.1742

If you do not trawl a site, you can verify that the site is clear of obstructions by using any of the methods shown in the following table:
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.