§250.109. What documents must I prepare and maintain related to welding?

30 C.F.R. § 250.109

(a)
You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan.
(b)
You must keep the following at the site where welding occurs:
(1)
A copy of the plan and its approval letter; and
(2)
Drawings showing the designated safe-welding areas.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§250.110. What must I include in my welding plan?

30 C.F.R. § 250.110

You must include all of the following in the welding plan that you prepare under § 250.109:
(a)
Standards or requirements for welders;
(b)
How you will ensure that only qualified personnel weld;
(c)
Practices and procedures for safe welding that address—
(1)
Welding in designated safe areas;
(2)
Welding in undesignated areas, including wellbay;
(3)
Fire watches;
(4)
Maintenance of welding equipment; and
(5)
Plans showing all designated safe-welding areas.
(d)
How you will prevent spark-producing activities (i.e., grinding, abrasive blasting/cutting and arc-welding) in hazardous locations.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§250.111. Who oversees operations under my welding plan?

30 C.F.R. § 250.111

A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is properly qualified according to the welding plan. This person also must inspect all welding equipment before welding.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§250.112. What standards must my welding equipment meet?

30 C.F.R. § 250.112

Your welding equipment must meet the following requirements:
(a)
All engine-driven welding equipment must be equipped with spark arrestors and drip pans;
(b)
Welding leads must be completely insulated and in good condition;
(c)
Hoses must be leak-free and equipped with proper fittings, gauges, and regulators; and
(d)
Oxygen and fuel gas bottles must be secured in a safe place.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.

§250.113. What procedures must I follow when welding?

30 C.F.R. § 250.113

(a)
Before you weld, you must move any equipment containing hydrocarbons or other flammable substances at least 35 feet horizontally from the welding area. You must move similar equipment on lower decks at least 35 feet from the point of impact where slag, sparks, or other burning materials could fall. If moving this equipment is impractical, you must protect that equipment with flame-proofed covers, shield it with metal or fire-resistant guards or curtains, or render the flammable substances inert.
(b)
While you weld, you must monitor all water-discharge-point sources from hydrocarbon-handling vessels. If a discharge of flammable fluids occurs, you must stop welding.
(c)
If you cannot weld in one of the designated safe-welding areas that you listed in your safe welding plan, you must meet the following requirements:
(1)
You may not begin welding until:
(i)
The welding supervisor or designated person in charge advises in writing that it is safe to weld.
(ii)
You and the designated person in charge inspect the work area and areas below it for potential fire and explosion hazards.
(2)
During welding, the person in charge must designate one or more persons as a fire watch. The fire watch must:
(i)
Have no other duties while actual welding is in progress;
(ii)
Have usable firefighting equipment;
(iii)
Remain on duty for 30 minutes after welding activities end; and
(iv)
Maintain a continuous surveillance with a portable gas detector during the welding and burning operation if welding occurs in an area not equipped with a gas detector.
(3)
You may not weld piping, containers, tanks, or other vessels that have contained a flammable substance unless you have rendered the contents inert and the designated person in charge has determined it is safe to weld. This does not apply to approved hot taps.
(4)
You may not weld within 10 feet of a wellbay unless you have shut in all producing wells in that wellbay.
(5)
You may not weld within 10 feet of a production area, unless you have shut in that production area.
(6)
You may not weld while you drill, complete, workover, or conduct wireline operations unless:
(i)
The fluids in the well (being drilled, completed, worked over, or having wireline operations conducted) are noncombustible; and
(ii)
You have precluded the entry of formation hydrocarbons into the wellbore by either mechanical means or a positive overbalance toward the formation.
Notes, amendments, and revision history

Authority

Authority: 30 U.S.C. 1751, 31 U.S.C. 9701, 33 U.S.C. 1321(j)(1)(C), 43 U.S.C. 1334.

Source

Source: 76 FR 64462, Oct. 18, 2011, unless otherwise noted.