§203.0. What definitions apply to this part? — Inbound Citations
30 C.F.R. § 203.0
Cited by 5 regulations in release Current.
Citations to 30 U.S.C. § 203.0 as a whole
-
(5) For which you have provided the notices and information required under § 203.47.Complete application means an original and two copies of the six reports consisting of the data specified in §§ 203.81, 203.83, and 203.85 through 203.89, along with one set of digital information, which Bureau of Safety and Environmental Enforcement (BSEE) has reviewed and found complete.Deep well means either an original well or a sidetrack with a perforated interval the top of which is at least 15,000 feet TVD SS and less than 20,000 feet TVD SS. A deep well subsequently re-perforated at less than 15,000 feet TVD SS in the same reservoir is still a deep well.Determination means the binding decision by BSEE on whether your field qualifies for relief or how large a royalty-suspension volume must be to make the field economically viable.Development project means a project to develop one or more oil or gas reservoirs located on one or more contiguous leases that have had no production (other than test production) before the current application for royalty relief and are either:
-
(e) The BSEE Regional Supervisor for Production and Development may extend the deadline for beginning production for up to one year for a well that cannot begin production before the applicable date prescribed in the definition of “qualified deep well” in § 203.0 if it meets all of the following criteria.(1) The well otherwise meets the criteria in the definition of a qualified deep well in § 203.0.(3) Production (other than test production) was expected to begin from the well before the applicable deadline in the definition of a qualified deep well in § 203.0. You must provide a credible activity schedule with supporting documentation.(4) The delay in beginning production is for reasons beyond your control, such as adverse weather and accidents which BSEE deems were unavoidable.
-
(1) Information that allows BSEE to confirm that you drilled a certified unsuccessful well as defined under § 203.0, including:(i) Well log data, if your original well or sidetrack does not meet the producibility requirements of 30 CFR part 550, subpart A; or(ii) Well log, well test, seismic, and economic data, if your well does meet the producibility requirements of 30 CFR part 550, subpart A; and
-
(a) You may exercise an option to replace the applicable lease terms for royalty relief related to deep-well drilling with those in § 203.0 and §§ 203.40 through 203.48 if you have a lease issued with royalty relief provisions for deep-well drilling. Such leases:(1) Must be issued as part of an OCS lease sale held after January 1, 2001, and before April 1, 2004; and(2) Must be located wholly west of 87 degrees, 30 minutes West longitude in the GOA entirely or partly in water less than 200 meters deep.
-