§5.1. Purpose and scope. — Inbound Citations

29 C.F.R. § 5.1

Cited by 17 regulations in release Current.

Citations to 29 C.F.R. § 5.1 as a whole

  • On an annual basis, each Federal agency using wage determinations under the Davis-Bacon Act or any of the laws referenced by § 5.1 of this subtitle, must furnish the Administrator with a report that contains a general outline of its proposed construction programs for the upcoming 3 fiscal years based on information in the Federal agency's possession at the time it furnishes its report. This report must include a list of proposed projects (including those for which options to extend the contract term of an existing construction contract are expected during the period covered by the report); the estimated start date of construction; the anticipated type or types of construction; the estimated cost of construction; the location or locations of construction; and any other project-specific information that the Administrator requests. The report must also include notification of any significant changes to previously reported construction programs, such as the delay or cancellation of previously reported projects. Reports must be submitted no later than April 10 of each year by email to [email protected], and must include the name, telephone number, and email address of the official responsible for coordinating the submission.
  • (1) If a contract subject to the labor standards provisions of the laws referenced by § 5.1 of this subtitle is entered into without the correct wage determination(s), the agency must, upon the request of the Administrator or upon its own initiative, incorporate the correct wage determination into the contract or require its incorporation. Where the agency is not entering directly into such a contract but instead is providing Federal financial assistance, the agency must ensure that the recipient or sub-recipient of the Federal assistance similarly incorporates the correct wage determination(s) into its contracts.
  • (a) In cases other than those forwarded to the Attorney General of the United States under paragraph (b) of this section where violations of the labor standards clauses contained in § 5.5 and the applicable statutes referenced by § 5.1 result in underpayment of wages to workers or monetary damages caused by violations of § 5.5(a)(11) or (b)(5), the Federal agency or an authorized representative of the Department of Labor will request that restitution be made to such workers or on their behalf to plans, funds, or programs for any type of bona fide fringe benefits within the meaning of 40 U.S.C. 3141(2)(B), including interest from the date of the underpayment or loss. Interest on any back wages or monetary relief provided for in this part will be calculated using the percentage established for the underpayment of taxes under 26 U.S.C. 6621 and will be compounded daily.
  • (1) In the event of a dispute described in paragraph (a) of this section in which it appears that relevant facts are at issue, the Administrator will notify the affected contractor and subcontractor, if any, by registered or certified mail to the last known address or by any other means normally assuring delivery, of the investigation findings. If the Administrator determines that there is reasonable cause to believe that either the contractor, the subcontractor, or both, should also be subject to debarment under the Davis-Bacon Act or any of the other applicable statutes referenced by § 5.1, the notification will so indicate.
  • (1) Whenever any contractor or subcontractor is found by the Secretary of Labor to have disregarded their obligations to workers or subcontractors under the Davis-Bacon Act, any of the other applicable statutes referenced by § 5.1, this part, or part 3 of this subtitle, such contractor or subcontractor and their responsible officers, if any, and any firm, corporation, partnership, or association in which such contractor, subcontractor, or responsible officer has an interest will be ineligible for a period of 3 years to be awarded any contract or subcontract of the United States or the District of Columbia and any contract or subcontract subject to the labor standards provisions of any of the statutes referenced by § 5.1.
  • (a) All questions relating to the application and interpretation of wage determinations (including the classifications therein) issued pursuant to part 1 of this subtitle, of the rules contained in this part and in parts 1 and 3 of this subtitle, and of the labor standards provisions of any of the laws referenced in § 5.1 must be referred to the Administrator for appropriate ruling or interpretation. These rulings and interpretations are authoritative and those under the Davis-Bacon Act may be relied upon as provided for in section 10 of the Portal-to-Portal Act of 1947 (29 U.S.C. 259). Requests for such rulings and interpretations should be submitted via email to [email protected]; by mail to Administrator, Wage and Hour Division, U.S. Department of Labor, 200 Constitution Ave., NW, Washington, DC 20210; or through other means directed by the Administrator.
  • The Secretary of Labor may make variations, tolerances, and exemptions from the regulatory requirements of this part and those of parts 1 and 3 of this subtitle whenever the Secretary finds that such action is necessary and proper in the public interest or to prevent injustice and undue hardship. Variations, tolerances, and exemptions may not be made from the statutory requirements of any of the statutes listed in § 5.1 unless the statute specifically provides such authority.
  • (2) [Reserved]
    Agency Head. The term “Agency Head” means the principal official of an agency and includes those persons duly authorized to act on behalf of the Agency Head.
    Apprentice and helper. The terms “apprentice” and “helper” are defined as follows:
  • (a) The Agency head will cause or require the contracting officer to require the contracting officer to insert in full, or (for contracts covered by the Federal Acquisition Regulation (48 CFR chapter 1)) by reference, in any contract in excess of $2,000 which is entered into for the actual construction, alteration and/or repair, including painting and decorating, of a public building or public work, or building or work financed in whole or in part from Federal funds or in accordance with guarantees of a Federal agency or financed from funds obtained by pledge of any contract of a Federal agency to make a loan, grant or annual contribution (except where a different meaning is expressly indicated), and which is subject to the labor standards provisions of any of the laws referenced by § 5.1, the following clauses (or any modifications thereof to meet the particular needs of the agency, Provided, That such modifications are first approved by the Department of Labor):
    (i) All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in paragraphs (d) and (e) of this section, the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (a)(1)(v) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in paragraph (a)(4) of this section. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under paragraph (a)(1)(iii) of this section) and the Davis-Bacon poster (WH-1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.
    (A) In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to paragraph (a)(1)(iii) of this section, provided that:
    (1) The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;
    (2) The classification is used in the area by the construction industry; and
    (3) The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.
    (B) The Administrator will establish wage rates for such classifications in accordance with paragraph (a)(1)(iii)(A)(3) of this section. Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.
    (A) The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:
    (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; and
    (2) The classification is used in the area by the construction industry; and
    (3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.
    (B) The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.
    (C) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to [email protected]. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
    (D) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to [email protected], refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.
    (E) The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under paragraphs (a)(1)(iii)(C) and (D) of this section. The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to paragraph (a)(1)(iii)(C) or (D) of this section must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.
    (iv) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.
    (v) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in § 5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.
    (vi) In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.
    (i) The [write in name of Federal agency or the recipient of Federal assistance] may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in paragraph (a) of this section for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in § 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor's failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work (or otherwise working in construction or development of the project under a development statute) all or part of the wages required by the contract, or upon the contractor's failure to submit the required records as discussed in paragraph (a)(3)(iv) of this section, the [Agency] may on its own initiative and after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.
    (ii) The Department has priority to funds withheld or to be withheld in accordance with paragraph (a)(2)(i) or (b)(3)(i) of this section, or both, over claims to those funds by:
    (A) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;
    (B) A contracting agency for its reprocurement costs;
    (C) A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;
    (D) A contractor's assignee(s);
    (E) A contractor's successor(s); or
    (F) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
    (A) All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.
    (B) Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker's correct classification(s) of work actually performed; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of hours actually worked in total and on each covered contract; deductions made; and actual wages paid.
    (C) Whenever the Secretary of Labor has found under paragraph (a)(1)(v) of this section that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.
    (D) Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.
    (A) The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to the [write in name of appropriate Federal agency] if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the [write in name of agency]. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system.
    (B) The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph (a)(3)(i)(B) of this section, except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker (e.g., the last four digits of the worker's Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH-347 or in any other format desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division website at https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records).
    (C) Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following:
    (1) That the certified payroll for the payroll period contains the information required to be provided under paragraph (a)(3)(ii) of this section, the appropriate information and basic records are being maintained under paragraph (a)(3)(i) of this section, and such information and records are correct and complete;
    (2) That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; and
    (3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.
    (D) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 will satisfy the requirement for submission of the “Statement of Compliance” required by paragraph (a)(3)(ii)(C) of this section.
    (E) The signature by the contractor, subcontractor, or the contractor's or subcontractor's agent must be an original handwritten signature or a legally valid electronic signature.
    (F) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
    (G) The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
    (iii) The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.
    (A) The contractor or subcontractor must make the records required under paragraphs (a)(3)(i) through (iii) of this section, and any other documents that the [write the name of the agency] or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by § 5.1, available for inspection, copying, or transcription by authorized representatives of the [write the name of the agency] or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.
    (B) If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job, the Federal agency may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, that maintains such records or that employs such workers, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available, or to permit worker interviews during working hours on the job, may be grounds for debarment action pursuant to § 5.12. In addition, any contractor or other person that fails to submit the required records or make those records available to WHD within the time WHD requests that the records be produced will be precluded from introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the required records that were not provided or made available to WHD. WHD will take into consideration a reasonable request from the contractor or person for an extension of the time for submission of records. WHD will determine the reasonableness of the request and may consider, among other things, the location of the records and the volume of production.
    (C) Contractors and subcontractors must maintain the full Social Security number and last known address, telephone number, and email address of each covered worker, and must provide them upon request to the [write in name of appropriate Federal agency] if the agency is a party to the contract, or to the Wage and Hour Division of the Department of Labor. If the Federal agency is not such a party to the contract, the contractor, subcontractor, or both, must, upon request, provide the full Social Security number and last known address, telephone number, and email address of each covered worker to the applicant, sponsor, owner, or other entity, as the case may be, that maintains such records, for transmission to the [write in name of agency], the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or other compliance action.
    (A) Apprentices will be permitted to work at less than the predetermined rate for the work they perform when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship (OA), or with a State Apprenticeship Agency recognized by the OA. A person who is not individually registered in the program, but who has been certified by the OA or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice, will be permitted to work at less than the predetermined rate for the work they perform in the first 90 days of probationary employment as an apprentice in such a program. In the event the OA or a State Apprenticeship Agency recognized by the OA withdraws approval of an apprenticeship program, the contractor will no longer be permitted to use apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.
    (B) Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringe benefits must be paid in accordance with that determination.
    (C) The allowable ratio of apprentices to journeyworkers on the job site in any craft classification must not be greater than the ratio permitted to the contractor as to the entire work force under the registered program or the ratio applicable to the locality of the project pursuant to paragraph (a)(4)(i)(D) of this section. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph (a)(4)(i)(A) of this section, must be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under this section must be paid not less than the applicable wage rate on the wage determination for the work actually performed.
    (D) Where a contractor is performing construction on a project in a locality other than the locality in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyworker's hourly rate) applicable within the locality in which the construction is being performed must be observed. If there is no applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified in the contractor's registered program must be observed.
    (ii) The use of apprentices and journeyworkers under this part must be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.
    (5) The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.
    (6) The contractor or subcontractor must insert in any subcontracts the clauses contained in paragraphs (a)(1) through (11) of this section, along with the applicable wage determination(s) and such other clauses or contract modifications as the [write in the name of the Federal agency] may by appropriate instructions require, and a clause requiring the subcontractors to include these clauses and wage determination(s) in any lower tier subcontracts. The prime contractor is responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in this section. In the event of any violations of these clauses, the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief, including interest from the date of the underpayment or loss, due to any workers of lower-tier subcontractors, and may be subject to debarment, as appropriate.
    (7) A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.
    (8) All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.
    (9) Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.
    (i) By entering into this contract, the contractor certifies that neither it nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b) or § 5.12(a).
    (ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b) or § 5.12(a).
    (iii) The penalty for making false statements is prescribed in the U.S. Code, Title 18 Crimes and Criminal Procedure, 18 U.S.C. 1001.
    (11) It is unlawful for any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, or to cause any person to discharge, demote, intimidate, threaten, restrain, coerce, blacklist, harass, or in any other manner discriminate against, any worker or job applicant for:
    (i) Notifying any contractor of any conduct which the worker reasonably believes constitutes a violation of the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
    (ii) Filing any complaint, initiating or causing to be initiated any proceeding, or otherwise asserting or seeking to assert on behalf of themselves or others any right or protection under the DBA, Related Acts, this part, or 29 CFR part 1 or 3;
    (iii) Cooperating in any investigation or other compliance action, or testifying in any proceeding under the DBA, Related Acts, this part, or 29 CFR part 1 or 3; or
    (iv) Informing any other person about their rights under the DBA, Related Acts, this part, or 29 CFR part 1 or 3.
  • (i) The Federal agency has the initial responsibility to ascertain whether the clauses required by § 5.5 and the appropriate wage determination(s) have been incorporated into the contracts subject to the labor standards provisions of the laws referenced by § 5.1. Additionally, a Federal agency that provides Federal financial assistance that is subject to the labor standards provisions of the Act must promulgate the necessary regulations or procedures to require the recipient or sub-recipient of the Federal assistance to insert in its contracts the provisions of § 5.5. No payment, advance, grant, loan, or guarantee of funds will be approved by the Federal agency unless it ensures that the clauses required by § 5.5 and the appropriate wage determination(s) are incorporated into such contracts. Furthermore, no payment, advance, grant, loan, or guarantee of funds will be approved by the Federal agency after the beginning of construction unless there is on file with the Federal agency a certification by the contractor that the contractor and its subcontractors have complied with the provisions of § 5.5 or unless there is on file with the Federal agency a certification by the contractor that there is a substantial dispute with respect to the required provisions.
  • (d) Where a contract is terminated by reason of violations of the labor standards provisions of the statutes listed in § 5.1, a report shall be submitted promptly to the Administrator and to the Comptroller General (if the contract is subject to the Davis-Bacon Act), giving the name and address of the contractor or subcontractor whose right to proceed has been terminated, and the name and address of the contractor or subcontractor, if any, who is to complete the work, the amount and number of the contract, and the description of the work to be performed.
  • (a) In the event of failure or refusal of the contractor or any subcontractor to comply with the applicable statutes referenced by § 5.1 and the labor standards clauses contained in § 5.5, whether incorporated into the contract physically, by reference, or by operation of law, the Federal agency (and any other agency), may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, take such action as may be necessary to cause the suspension of the payment, advance, or guarantee of funds until such time as the violations are discontinued and/or until sufficient funds are withheld as may be considered necessary to compensate workers for the full amount of wages and monetary relief to which they are entitled, and to cover any liquidated damages and pre-judgment or post-judgment interest which may be due.
  • This part provides the rules of practice for administrative proceedings under the Service Contract Act, the Davis-Bacon Act and related statutes listed in § 5.1 of part 5 of this title which require payment of wages determined in accordance with the Davis-Bacon Act, the Contract Work Hours and Safety Standards Act, and the Copeland Act. See parts 4 and 5 of this title.
  • (3) That any order concerning debarment under the Davis-Bacon Act (but not under any of the other statutes listed in § 5.1 of part 5 of this title) shall constitute a recommendation to the Comptroller General;
  • (2) If the respondent is found to have violated the labor standards provisions of any of the statutes listed in § 5.1 of part 5 of this title other than the Davis-Bacon Act, and if debarment action was requested pursuant to the complaint (notification letter) or any amendment thereto, the Administrative Law Judge shall issue an order as to whether the respondent is to be subject to the ineligible list as provided in § 5.12(a)(1) of this title, including any findings of aggravated or willful violations. If the respondent is found to have violated the Davis-Bacon Act, and if debarment action was requested, the Administrative Law Judge shall issue as a part of the order a recommendation as to whether respondent should be subject to the ineligible list pursuant to section 3(a) of the Act, including any findings regarding respondent's disregard of obligations to employees and subcontractors. If wages are found due and are unpaid, no relief from the ineligible list shall be ordered or recommended except on condition that such wages are paid.
  • Upon the final decision of the Administrative Law Judge or Administrative Review Board, as appropriate, regarding violations of any statute listed in § 5.1 of part 5 of this title other than the Davis-Bacon Act, the Administrator promptly shall foward to the Comptroller General the name of any respondent found to have committed aggravated or willful violations of the labor standards provisions of such statute, and the name of any firm, corporation, partnership, or association in which such respondent has a substantial interest. Upon the final decision of the Administrative Law Judge or Administrative Review Board, as appropriate, regarding violations of the Davis-Bacon Act, the Administrator promptly shall forward to the Comptroller General any recommendation regarding debarment action against a respondent, and the name of any firm, corporation, partnership, or association in which such respondent has an interest.
  • (f) The Administrator, Wage and Hour Division, may institute debarment proceedings against the contractor or subcontractor if the Administrator finds reasonable cause to believe that the contractor or subcontractor has committed willful or aggravated violations of the Contract Work Hours and Safety Standards statute or the Copeland (Anti-Kickback) Act, or any of the applicable statutes listed in 29 CFR 5.1 other than the Construction Wage Rate Requirements statute, or has committed violations of the Construction Wage Rate Requirements statute that constitute a disregard of its obligations to employees or subcontractors under 40 U.S.C. 3144.