§55.7. Identifying the FFRMS floodplain. — Inbound Citations
24 C.F.R. § 55.7
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 24 C.F.R. § 55.7 as a whole
-
(4) Federal Flood Risk Management Standard (FFRMS) floodplain means the floodplain as defined by Executive Order 13690 and the Guidelines for Implementing Executive Order 11988, Floodplain Management, and Executive Order 13690, Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input and further described as applied to HUD-assisted activities by § 55.7 of this part.
-
(a) Using the processes described in §§ 55.7 and 55.9, determine whether the proposed action is located in the FFRMS floodplain or results in new construction that directly impacts an onsite wetland. If the action does not occur in the FFRMS floodplain or include new construction directly impacting an onsite wetland, then no further compliance with this section is required. Where the proposed action would be located in the FFRMS floodplain and includes new construction directly impacting an onsite wetland, these impacts should be evaluated together in a single 8-step decision making process. In such a case, the wetland will be considered among the primary natural and beneficial functions and values of the floodplain. For purposes of this section, an “action” includes areas required for ingress and egress, even if they are not within the site boundary, and other integral components of the proposed action, even if they are not within the site boundary.
-
(a) For actions in the FFRMS floodplain (as defined in § 55.7), HUD (or HUD's designee) or the responsible entity must ensure that any party participating in the transaction is notified that the property is in the FFRMS floodplain and whether flood insurance is required or available in this location. Notification shall also include a description of the approximate elevation of the FFRMS floodplain, proximity to flood-related infrastructure impacting the site including dams and levees, the location of ingress and egress or evacuation routes relative to the FFRMS floodplain, disclosure of information on flood insurance claims filed on the property to the extent available from FEMA, and other relevant information such as available emergency notification resources.
Citations to §55.7(e)
-
(A) Identification of portions of the site that are subject to flood risk, documented through mapping and, as required by § 55.7(e) or commensurate with the scale of the project and available resources as permitted by § 55.7(f), climate-informed analysis of factors including development patterns, streamflow, and hydrologic and hydraulic modeling;
Citations to §55.7(f)
-
(A) Identification of portions of the site that are subject to flood risk, documented through mapping and, as required by § 55.7(e) or commensurate with the scale of the project and available resources as permitted by § 55.7(f), climate-informed analysis of factors including development patterns, streamflow, and hydrologic and hydraulic modeling;