§750.307. FHWA project approval.

23 C.F.R. § 750.307

Authorization to proceed with acquisitions on a sign removal project shall not be issued until such time as the State has submitted to FHWA the following:
(a)
A general description of the project.
(b)
The total number of signs to be acquired.
(c)
The total estimated cost of the sign removal project, including a breakdown of incidental, acquisition and removal costs.