§650.809. Movable span bridges.
23 C.F.R. § 650.809
A fixed bridge shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the movable bridge shall he prepared as a part of the preliminary plans.
Notes, amendments, and revision history
Source
Source: 52 FR 28139, July 28, 1987, unless otherwise noted.
Authority
Authority: 23 U.S.C. 119, 144, and 315.