§650.205. Definitions.
23 C.F.R. § 650.205
Permanent erosion and sediment control measures and practices are installations and design features of a construction project which remain in place and in service after completion of the project.
Pollutants are substances, including sediment, which cause deterioration of water quality when added to surface or ground waters in sufficient quantity.
Sediment control measures and practices are actions taken to control the deposition of sediments resulting from surface runoff.
Temporary erosion and sediment control measures and practices are actions taken on an interim basis during construction to minimize the disturbance, transportation, and unwanted deposition of sediment.
Notes, amendments, and revision history
Source
Source: 59 FR 37939, July 26, 1994, unless otherwise noted.
Authority
Authority: 23 U.S.C. 119, 144, and 315.