§5.18. Application content.
18 C.F.R. § 5.18
(1) Increase capacity or generation at the project;
(2) Coordinate the operation of the project with any upstream or downstream water resource projects; and
(3) Coordinate the operation of the project with the applicant's or other electrical systems to minimize the cost of production.
(1) The reasonable costs and reasonable availability of alternative sources of power that would be needed by the applicant or its customers, including wholesale customers, if the applicant is not granted a license for the project;
(2) A discussion of the increase in fuel, capital, and any other costs that would be incurred by the applicant or its customers to purchase or generate power necessary to replace the output of the licensed project, if the applicant is not granted a license for the project;
(3) The effect of each alternative source of power on:
(i) The applicant's customers, including wholesale customers;
(ii) The applicant's operating and load characteristics; and
(iii) The communities served or to be served, including any reallocation of costs associated with the transfer of a license from the existing licensee.
(1) The average annual cost of the power produced by the project, including the basis for that calculation;
(2) The projected resources required by the applicant to meet the applicant's capacity and energy requirements over the short and long term including:
(i) Energy and capacity resources, including the contributions from the applicant's generation, purchases, and load modification measures (such as conservation, if considered as a resource), as separate components of the total resources required;
(ii) A resource analysis, including a statement of system reserve margins to be maintained for energy and capacity; and
(iii) If load management measures are not viewed as resources, the effects of such measures on the projected capacity and energy requirements indicated separately;
(iv) For alternative sources of power, including generation of additional power at existing facilities, restarting deactivated units, the purchase of power off-system, the construction or purchase and operation of a new power plant, and load management measures such as conservation: The total annual cost of each alternative source of power to replace project power; the basis for the determination of projected annual cost; and a discussion of the relative merits of each alternative, including the issues of the period of availability and dependability of purchased power, average life of alternatives, relative equivalent availability of generating alternatives, and relative impacts on the applicant's power system reliability and other system operating characteristics; and the effect on the direct providers (and their immediate customers) of alternate sources of power.
(1) An analysis of the effects of any resulting redistribution of power flows on line loading (with respect to applicable thermal, voltage, or stability limits), line losses, and necessary new construction of transmission facilities or upgrading of existing facilities, together with the cost impact of these effects;
(2) An analysis of the advantages that the applicant's transmission system would provide in the distribution of the project's power; and
(3) Detailed single-line diagrams, including existing system facilities identified by name and circuit number, that show system transmission elements in relation to the project and other principal interconnected system elements. Power flow and loss data that represent system operating conditions may be appended if applicants believe such data would be useful to show that the operating impacts described would be beneficial.
(1) A statement of the applicant's record of encouraging or assisting its customers to conserve electricity and a description of its plans and capabilities for promoting electricity conservation by its customers; and
(2) A statement describing the compliance of the applicant's energy conservation programs with any applicable regulatory requirements.
(1) A description of existing and planned operation of the project during flood conditions;
(2) A discussion of any warning devices used to ensure downstream public safety;
(3) A discussion of any proposed changes to the operation of the project or downstream development that might affect the existing Emergency Action Plan, as described in subpart C of part 12 of this chapter, on file with the Commission;
(4) A description of existing and planned monitoring devices to detect structural movement or stress, seepage, uplift, equipment failure, or water conduit failure, including a description of the maintenance and monitoring programs used or planned in conjunction with the devices; and
(5) A discussion of the project's employee safety and public safety record, including the number of lost-time accidents involving employees and the record of injury or death to the public within the project boundary.
(2) A discussion of any measures proposed by the applicant to implement the existing licensee's Emergency Action Plan, as described in subpart C of part 12 of this chapter, and any proposed changes;
(3) A description of the applicant's plans to continue safety monitoring of existing project instrumentation and any proposed changes; and
(4) A statement indicating whether or not the applicant is requesting the licensee to provide transmission services under section 15(d) of the Federal Power Act.
Notes, amendments, and revision history
Amendments
[Order 2002, 68 FR 51121, Aug. 25, 2003; 68 FR 61742, Oct. 30, 2003; 68 FR 69957, Dec. 16, 2003; Order 699, 72 FR 45324, Aug. 14, 2007; Order 756, 77 FR 4894, Feb. 1, 2012; Order 877, 86 FR 42715, Aug. 5, 2021]
Authority
Authority: 16 U.S.C. 792-828c, 2601-2645; 42 U.S.C. 7101-7352.
Source
Source: Order 2002, 68 FR 51121, Aug. 25, 2003, unless otherwise noted.
Amendments
[Order 2002, 68 FR 51121, Aug. 25, 2003; 68 FR 61742, Oct. 30, 2003; 68 FR 69957, Dec. 16, 2003; Order 699, 72 FR 45324, Aug. 14, 2007; Order 756, 77 FR 4894, Feb. 1, 2012; Order 877, 86 FR 42715, Aug. 5, 2021]