US Codex
C.F.R.
Browse by date
Notes

§4.41. Contents of application. — Inbound Citations

18 C.F.R. § 4.41

Cited by 18 regulations in release Current.

Citations to 18 C.F.R. § 4.41 as a whole

Citations to §4.41(f)

  • (1) Any application must contain an Exhibit E conforming with the data and consultation requirements of § 4.41(f), if the application is for license for a water power project which has or is proposed to have a total installed generating capacity greater than 1.5 MW but not greater than 10 MW, and which:
    (i) Would use the water power potential of a dam and impoundment which, at the time of application, has not been constructed (see § 4.30(b)(15)); or
    (ii) Involves any repair, modification or reconstruction of an existing dam that would result in a significant change in the normal maximum surface area or elevation of an existing impoundment or involves any change in existing project works or operations that would result in a significant environmental impact (see § 4.30(b)(14)).
  • (ii) Submitting with its application an environmental report that meets the requirements of § 4.41(f) of this chapter, regardless of project size;

Citations to §4.41(g)

Citations to §4.41(h)