§4.40. Applicability. — Inbound Citations
18 C.F.R. § 4.40
Statutory Authority
Cited by 1 regulation in release Current.
Citations to 18 C.F.R. § 4.40 as a whole
-
(2) existing dam (see § 4.40) that is proposed to entail or include:(i) Any repair, modification or reconstruction of an existing dam that would result in a significant change in the normal maximum surface area or normal maximum surface elevation of an existing impoundment; or(ii) Any new development or change in project operation that would result in a significant environmental impact.