§4.32. Acceptance for filing or rejection; information to be made available to the public; requests for additional studies. — Inbound Citations
18 C.F.R. § 4.32
Statutory Authority
Cited by 40 regulations in release Current.
Citations to 18 C.F.R. § 4.32 as a whole
-
Any licensee desiring to transfer a license or rights thereunder granted, and the person, association, corporation, State, or municipality desiring to acquire the same, shall jointly or severally file an application for approval of such transfer and acquisition. Such application shall be verified, shall conform to § 131.20 of this chapter, and shall be filed in accordance with § 4.32 of this chapter.
-
(a) If an existing licensee that indicates in the notice filed pursuant to § 16.6 that it will file an application for new license, nonpower license, subsequent license, or an exemption does not file its application individually or in conjunction with an entity or entities that are not currently licensees of the project at least 24 months before its existing license expires in the case of licenses subject to sections 14 and 15 of the Federal Power Act, or by the deadlines specified in § 16.20(c) in the case of licenses not subject to sections 14 and 15 of the Federal Power Act, and no other applicant files an application within the appropriate time or all pending applications filed before the applicable filing deadline are subsequently rejected or dismissed pursuant to § 4.32 of this chapter, the Commission will publish in the Federal Register and once in a daily or weekly newspaper published in the county or counties in which the project or any part thereof or the lands affected thereby are situated, notice soliciting applications from potential applicants other than the existing licensee.
-
-
-
(2) The Commission finds, at the time the application for the license or exemption is accepted for filing under § 4.32 of this chapter, that the project is not located on any segment of a natural watercourse which:(i) Is included, or designated for potential inclusion in, a State or National wild and scenic river system; or(ii) The State has determined, in accordance with applicable State law, to possess unique natural, recreational, cultural or scenic attributes which would be adversely affected by hydroelectric development; and
Citations to §4.32(a)
-
(i) Does not conform to the requirements of §§ 4.32(a), 4.32(b), or 4.38, under § 4.32(d)(1) or
Citations to §4.32(b)
-
(ii) The provisions of § 4.32(b) will govern the form and manner in which the information is to be made available for public inspection and reproduction.
-
(i) Does not conform to the requirements of §§ 4.32(a), 4.32(b), or 4.38, under § 4.32(d)(1) or
Citations to §4.32(b)(1)
-
(vii) The applicant must provide five copies (rather than the eight copies required under § 4.32(b)(1) of the Commission's regulations) of any survey, inventory, or subsurface testing reports containing specific site and property information, and including maps and photographs showing the location and any required alteration of historic and archaeological resources in relation to proposed project facilities.
-
Any licensee desiring to lease the project property covered by a license or any part thereof, where the lessee is granted the exclusive occupancy, possession, or use of project works for purposes of generating, transmitting, or distributing power, and the person, association, or corporation, State, or municipality desiring to acquire the project property by lease, must file the proposed lease together with the application in accordance with § 4.32(b)(1) of this chapter. The application and the Commission's action on it will, in general, be subject to the provisions of §§ 9.1 through 9.3.
Citations to §4.32(b)(3)
-
(9) The requirements of paragraphs (b)(3) to (b)(8) of this section only apply to an application for license or exemption filed on or after May 20, 1991. Paragraphs (b)(3) and (b)(4) of this section do not apply to applications subject to the requirements of § 16.7 of this chapter.
Citations to §4.32(b)(4)
-
(9) The requirements of paragraphs (b)(3) to (b)(8) of this section only apply to an application for license or exemption filed on or after May 20, 1991. Paragraphs (b)(3) and (b)(4) of this section do not apply to applications subject to the requirements of § 16.7 of this chapter.
Citations to §4.32(b)(5)
-
(9) The requirements of paragraphs (b)(3) to (b)(8) of this section only apply to an application for license or exemption filed on or after May 20, 1991. Paragraphs (b)(3) and (b)(4) of this section do not apply to applications subject to the requirements of § 16.7 of this chapter.
Citations to §4.32(b)(6)
-
(9) The requirements of paragraphs (b)(3) to (b)(8) of this section only apply to an application for license or exemption filed on or after May 20, 1991. Paragraphs (b)(3) and (b)(4) of this section do not apply to applications subject to the requirements of § 16.7 of this chapter.
Citations to §4.32(b)(7)
-
(9) The requirements of paragraphs (b)(3) to (b)(8) of this section only apply to an application for license or exemption filed on or after May 20, 1991. Paragraphs (b)(3) and (b)(4) of this section do not apply to applications subject to the requirements of § 16.7 of this chapter.
Citations to §4.32(b)(8)
-
(9) The requirements of paragraphs (b)(3) to (b)(8) of this section only apply to an application for license or exemption filed on or after May 20, 1991. Paragraphs (b)(3) and (b)(4) of this section do not apply to applications subject to the requirements of § 16.7 of this chapter.
Citations to §4.32(c)(1)
-
(3) Amends its filed application in order to change its statement of intent of whether or not it will seek benefits under section 210 of PURPA, as originally filed under § 4.32(c)(1).
Citations to §4.32(c)(4)
-
(1) Within 60 days after the last date for filing mandatory terms and conditions pursuant to § 4.32(c)(4) for a new dam or diversion license application seeking PURPA benefits, § 4.93(b) for an application for exemption of a small conduit hydroelectric facility, or § 4.105(b)(1) for an application for case-specific exemption of a small hydroelectric power project, a fish and wildlife agency must file with the Commission a cost statement of the reasonable costs the agency incurred in setting mandatory terms and conditions for the proposed project. An agency may request, in writing, along with any supporting documentation an extension of this 60-day period.
Citations to §4.32(d)
-
(d) Each map or drawing must be drawn and lettered to be legible when it is reduced to a print that is 11 inches on its shorter side. Following notification to the applicant that the application has been accepted for filing see [§ 4.32(d)], prints reduced to that size must be bound in each copy of the application which is required to be submitted to the Commission or provided to any person, agency, or other entity.
Citations to §4.32(d)(1)
-
(i) Does not conform to the requirements of §§ 4.32(a), 4.32(b), or 4.38, under § 4.32(d)(1) or
Citations to §4.32(d)(2)
-
(3) If the first accepted license application for a project was filed by a qualified exemption applicant, the applicant may request that its license application be treated initially as an application for exemption from licensing by so notifying the Commission in writing and, unless only rights to use or occupy Federal lands would be necessary to develop and operate the project, by submitting documentary evidence showing that the applicant holds the real property interests required under § 4.31. Such notice and documentation must be submitted not later than the last date for filing protests or motions to intervene prescribed in the public notice issued for its license application under § 4.32(d)(2).
-
(3) Reissuing public notice of the application under § 4.32(d)(2).
-
(c) The requirements of § 4.35 of this chapter do not apply to an application for a new or subsequent license, except that the Commission will reissue a public notice of the application in accordance with the provisions of § 4.32(d)(2) of this chapter if a material amendment, as that term is used in § 4.35(f) of this chapter, is filed.
Citations to §4.32(d)(2)(i)
-
(b) If an application for amendment of a preliminary permit requests any material change in the proposed project, public notice of the application will be issued as required in § 4.32(d)(2)(i).
Citations to §4.32(e)
-
(r) Commitment of substantial monetary resources means the expenditure of, or commitment to expend, at least 50 percent of the total cost of preparing an application for license or exemption for a hydroelectric project that is accepted for filing by the Commission pursuant to § 4.32(e) of this chapter. The total cost includes (but is not limited to) the cost of agency consultation, environmental studies, and engineering studies conducted pursuant to § 4.38 of this chapter, and the Commission's requirements for filing an application for license exemption.
-
(8) If the application is deficient pursuant to § 4.32(e) of this chapter, the applicant must include with the information correcting those deficiencies a statement of the costs expended to make the corrections.
Citations to §4.32(e)(1)
-
(1) Any corrections of deficiencies made pursuant to § 4.32(e)(1);
-
(vi) Filing and acceptance of an application will not be delayed, and an application will not be considered deficient or patently deficient pursuant to § 4.32(e)(1) or (e)(2) of this part, merely because the application does not include a particular study or particular information if the Director had previously found, under paragraph (b)(6)(iv) of this section, that each study or information is unreasonable or unnecessary for an informed decision by the Commission on the merits of the application or use of the study methodology requested is not a generally accepted practice.
-
(ii) Filing and acceptance of an application will not be delayed and an application will not be considered deficient or patently deficient pursuant to § 4.32 (e)(1) or (e)(2) of this chapter merely because the study or information gathering is not complete before the application is filed.
Citations to §4.32(e)(1)(iii)
-
(ii) If revisions to an application are not timely submitted under § 4.32(e)(1)(iii); or
Citations to §4.32(e)(2)
-
(vi) Filing and acceptance of an application will not be delayed, and an application will not be considered deficient or patently deficient pursuant to § 4.32(e)(1) or (e)(2) of this part, merely because the application does not include a particular study or particular information if the Director had previously found, under paragraph (b)(6)(iv) of this section, that each study or information is unreasonable or unnecessary for an informed decision by the Commission on the merits of the application or use of the study methodology requested is not a generally accepted practice.
-
(ii) Filing and acceptance of an application will not be delayed and an application will not be considered deficient or patently deficient pursuant to § 4.32 (e)(1) or (e)(2) of this chapter merely because the study or information gathering is not complete before the application is filed.
Citations to §4.32(e)(2)(i)
-
(1) An application is patently deficient under § 4.32(e)(2)(i);
Citations to §4.32(f)
-
(a) Except as provided in paragraph (d) of this section, if an applicant amends its filed application as described in paragraph (b) of this section, the date of acceptance of the application under § 4.32(f) is the date on which the amendment to the application was filed.
Citations to §4.32(g)
-
(3) The applicant fails to provide timely additional information, documents, or copies of submitted materials under § 4.32(g).
Citations to §4.32(h)
-
(b) A prospective applicant for a license for a major unconstructed project or major modified project may seek advice from the Commission's Office of Energy Projects regarding the applicability of this subpart to its project see [§ 4.32(h)], including the determinations whether any proposed repair, modification or reconstruction of an existing dam would result in a significant change in the normal maximum surface elevation of an existing impoundment, or whether any proposed change in existing project works or operation would result in a significant environmental impact.
-
(b) A prospective applicant for a major license—existing dam may seek advice from the Commission staff regarding the applicability of these sections to its project (see § 4.32(h)), including the determinations whether any proposed repair or reconstruction of an existing dam would result in a significant change in the normal maximum surface area or the normal maximum surface elevation of an existing impoundment, or whether any proposed new development or change in project operation would result in a significant environmental impact.
Citations to §4.32(k)
-
(9) If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by § 388.113(c) of this chapter, to any person, the applicant shall follow the procedures set out in § 4.32(k).
-
(h) If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by § 388.113(c) of this chapter, to any person, the applicant shall follow the procedures set out in § 4.32(k).
-
If any action required by this part requires a potential Applicant or Applicant to reveal Critical Energy Infrastructure Information, as defined by § 388.113(c) of this chapter, to the public, the Applicant must follow the procedures set out in § 4.32(k) of this chapter.