§4.30. Applicability and definitions. — Inbound Citations
18 C.F.R. § 4.30
Statutory Authority
Cited by 16 regulations in release Current.
Citations to §4.30(b)
-
-
(c) The definitions in § 4.30(b) of this chapter apply to this part. In addition, for the purposes of this part—(1) Qualifying nonpowered dam means any dam, dike, embankment, or other barrier—(i) The construction of which was completed on or before October 23, 2018;(ii) That is or was operated for the control, release, or distribution of water for agricultural, municipal, navigational, industrial, commercial, environmental, recreational, aesthetic, drinking water, or flood control purposes; and(iii) That, as of October 23, 2018, was not generating electricity with hydropower generating works that were licensed under, or exempted from the license requirements contained in, Part I of the Federal Power Act.(2) Qualifying facility means a facility that is determined under section 34 of the Federal Power Act to meet the qualifying criteria for non-federal hydropower projects at existing nonpowered dams.(3) Qualifying criteria for closed-loop pumped storage projects means criteria that a pumped storage project must meet in order to qualify as a closed-loop pumped storage project eligible for the expedited process established under this part. These criteria require that the pumped storage project:(i) Cause little to no change to existing surface and groundwater flows and uses;(ii) Is unlikely to adversely affect species listed as a threatened species or endangered species, or designated critical habitat of such species, under the Endangered Species Act of 1973;(iii) Utilize only reservoirs situated at locations other than natural waterways, lakes, wetlands, and other natural surface water features; and(iv) Rely only on temporary withdrawals from surface waters or groundwater for the sole purposes of initial fill and periodic recharge needed for project operation.
Citations to §4.30(b)(14)
-
(3) Any major unconstructed project or major modified project, as defined in § 4.30(b)(15) and (14) respectively, that has a total installed capacity of 10 MW or less.
-
(ii) Involves any repair, modification or reconstruction of an existing dam that would result in a significant change in the normal maximum surface area or elevation of an existing impoundment or involves any change in existing project works or operations that would result in a significant environmental impact (see § 4.30(b)(14)).
Citations to §4.30(b)(15)
-
(3) Any major unconstructed project or major modified project, as defined in § 4.30(b)(15) and (14) respectively, that has a total installed capacity of 10 MW or less.
-
(i) Would use the water power potential of a dam and impoundment which, at the time of application, has not been constructed (see § 4.30(b)(15)); or
Citations to §4.30(b)(16)
-
(2) existing dam, as defined in § 4.30(b)(16), that has a total installed capacity of 10 MW or less; or
Citations to §4.30(b)(17)
-
(1) A minor water power project, as defined in § 4.30(b)(17);
Citations to §4.30(b)(26)
-
This part implements section 30(a) of the Federal Power Act, as amended, and provides procedures for obtaining a determination from the Commission that the facility to be constructed is a qualifying conduit hydropower facility, as defined in § 4.30(b)(26), and thus, is not required to be licensed under Part I of the FPA.
Citations to §4.30(b)(30)
-
This subpart implements section 30(b) of the Federal Power Act and provides procedures for obtaining an exemption for constructed or unconstructed small conduit hydroelectric facilities, as defined in § 4.30(b)(30), from all or part of the requirements of Part I of the Federal Power Act, including licensing, and the regulations issued under Part I.
-
(1) An introductory statement, including a declaration that the facility for which application is made meets the requirements of § 4.30(b)(30), or if the facility qualifies but for the discharge requirement of § 4.30(b)(30)(iv), the introductory statement must identify that fact and state that the application is accompanied by a petition for waiver of § 4.30(b)(30)(iv) filed pursuant to § 385.207 of this chapter;
-
(14) Exemptions for small conduit hydroelectric facilities as defined in § 4.30(b)(30) of this chapter under Part I of the Federal Power Act and Part 4 of this chapter;
Citations to §4.30(b)(30)(iv)
-
(1) An introductory statement, including a declaration that the facility for which application is made meets the requirements of § 4.30(b)(30), or if the facility qualifies but for the discharge requirement of § 4.30(b)(30)(iv), the introductory statement must identify that fact and state that the application is accompanied by a petition for waiver of § 4.30(b)(30)(iv) filed pursuant to § 385.207 of this chapter;
-
(a) An application for exemption that does not meet the eligibility requirements of § 4.30(b)(30)(iv) may be accepted, provided the application has been accompanied by a request for waiver under § 4.92(a)(1) and the waiver request has not been denied. Acceptance of an application that has been accompanied by a request for waiver under § 4.92(a)(1) does not constitute a ruling on the waiver request, unless expressly stated in the acceptance.
Citations to §4.30(b)(31)
-
This subpart provides procedures for exemption on a case-specific basis from all or part of Part I of the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in § 4.30(b)(31).
-
(7) Exemptions under section 405 of the Public Utility Regulatory Policies Act of 1978, as amended, and §§ 4.30(b)(31) and 4.101-4.108 of this chapter for small hydroelectric power projects of 10 MW or less;