US Codex
C.F.R.
Browse by date
Notes

§385.2011. Procedures for filing on electronic media (Rule 2011). — Inbound Citations

18 C.F.R. § 385.2011

Cited by 29 regulations in release Current.

Citations to 18 C.F.R. § 385.2011 as a whole

  • (b) If required, the applicant must submit information specified in paragraphs (b), (c), (d), (e) and (f) of § 33.3 or paragraphs (b), (c), (d) and (e) of § 33.4 on electronic recorded media (i.e., CD/DVD) in accordance with § 385.2011 of this chapter, along with a printed description and summary. The printed portion of the applicant's submission must include documentation for the electronic information, including all file names and a summary of the data contained in each file. Each column (or data item) in each separate data table or chart must be clearly labeled in accordance with the requirements of §§ 33.3 and 33.4. Any units of measurement associated with numeric entries must also be included.
  • (f) A permittee must file with the Commission, in writing and under oath, an original and four conformed copies, as provided in § 385.2011 of this chapter, of the following:
    (1) Within ten days after the bona fide beginning of construction, notice of the date of the beginning; and
    (2) Within ten days after authorized facilities have been constructed and placed in service, notice of the date of the completion of construction and commencement of service.
  • (iii) This report must be filed with the Federal Energy Regulatory Commission as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in this form, and must be properly completed and verified. Filing on electronic media pursuant to § 385.2011 of this chapter is required.
  • (i) Each Nonmajor and each Nonoperating (formerly designated as Nonmajor) public utility and licensee as defined in Part 101 of this chapter, shall prepare and file with the Commission FERC Form No. 1-F as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in this form, and must be properly completed and verified. Filing on electronic media pursuant to § 385.2011 of this chapter is required.
  • (4) This report must be filed as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in the quarterly financial report form, and must be properly completed and verified. Filing on electronic media pursuant to § 385.2011 of this chapter will be required commencing with the quarterly financial report ending March 31, 2004, due on or before July 9, 2004 for major public utilities and licensees, and due on or before July 23, 2004 for nonmajor public utilities and licensees.
  • (c) FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report, must be filed with the Federal Energy Regulatory Commission as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in this form.
  • (a) Each exhibit must be submitted in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter and contain a title page showing applicant's name, docket number (to be left blank), title of the exhibit, the proper letter designation of the exhibit, and, if of 10 or more pages, a table of contents, citing by page, section number or subdivision, the component elements or matters therein contained.
  • (a) All exhibits specified must accompany each application when tendered for filing. Together with each exhibit applicant must provide a full and complete explanation of the data submitted, the manner in which it was obtained, and the reasons for the conclusions derived from the exhibits. If the Commission determines that a formal hearing upon the application is required or that testimony and hearing exhibits should be filed, the Secretary will promptly notify the applicant that submittal of all exhibits and testimony of all witnesses to be sponsored by the applicant in support of his case-in-chief is required. Submittal of these exhibits and testimony must be within 20 days from the date of the Secretary's notice, or any other time as the Secretary will specify. Exhibits, except exhibits F, F- 1, G, G-I, and G-II, must be submitted to the Commission on electronic media as prescribed in § 385.2011 of this chapter. Receipt and delivery point information required in various exhibits must be labeled with a location point name and code in conformity with the location name and code the pipeline has adopted in conformance with § 284.13(f) of this chapter. Intervenors and persons becoming intervenors after the date of the Secretary's notice must be advised by the applicant of the afore-specified exhibits and testimony, and must be furnished with copies upon request. If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by § 388.113(c) of this chapter, to any person, the applicant shall follow the procedures set out in § 157.10(d).
    (1) If applicant is not an individual, a conformed copy of its articles of incorporation and bylaws, or other similar documents.
    (2) For each State where applicant is authorized to do business, a statement showing the date of authorization, the scope of the business applicant is authorized to carry on and all limitations, if any, including expiration dates and renewal obligations. A conformed copy of applicant's authorization to do business in each State affected shall be supplied upon request.
    (3) A list of the names and business addresses of applicant's officers and directors, or similar officials if applicant is not a corporation.
    (4) If applicant or any of its officers or directors, directly or indirectly, owns, controls, or holds with power to vote, 10 percent or more of the outstanding voting securities of any other person or organized group of persons engaged in production, transportation, distribution, or sale of natural gas, or of any person or organized group of persons engaged in the construction or financing of such enterprises or operations, a detailed explanation of each such relationship, including the percentage of voting strength represented by such ownership of securities. If any person or organized group of persons, directly or indirectly, owns, controls, or holds with power to vote, 10 percent or more of the outstanding voting securities of applicant—a detailed explanation of each such relationship.
    (5) A list of other applications and filings under sections 1, 3, 4 and 7 of the Natural Gas Act filed by the applicant which are pending before the Commission at the time of the filing of an application and which directly and significantly affect the application filed, including an explanation of any material effect the grant or denial of those other applications and filings will have on the application and of any material effect the grant or denial of the application will have on those other applications and filings.
    (6) Unless shown on Exhibit G or elsewhere, a geographical map of suitable scale and detail showing, and appropriately differentiating between all of the facilities proposed to be constructed, acquired or abandoned and existing facilities of applicant, the operation or capacity of which will be directly affected by the proposed facilities or the facilities proposed to be abandoned. This map, or an additional map, shall clearly show the relationship of the new facilities to the applicant's overall system and shall include:
    (A) Main-line industrial customers, gas pipeline or distribution systems, showing towns and communities served and to be served at wholesale and retail, and
    (7) An environmental report as specified in §§ 380.3 and 380.12 of this chapter. Applicant must submit all appropriate revisions to Exhibit F-I whenever route or site changes are filed. These revisions should identify the locations by mile post and describe all other specific differences resulting from the route or site changes, and should not simply provide revised totals for the resources affected.
    (8) A flow diagram showing daily design capacity and reflecting operating conditions with only existing facilities in operation. A second flow diagram showing daily design capacity and reflecting operating conditions with both proposed and existing facilities in operation. Both flow diagrams shall include the following for the portion of the system affected:
    (i) Diameter, wall thickness, and length of pipe installed and proposed to be installed and the diameter and wall thickness of the installed pipe to which connection is proposed.
    (ii) For each proposed new compressor station and existing station, the size, type and number of compressor units, horsepower required, horsepower installed and proposed to be installed, volume of gas to be used as fuel, suction and discharge pressures, and compression ratio.
    (iv) Pressures and volumes of gas at each intake and take-off point and at the beginning and terminus of the existing and proposed facilities and at the intake or take-off point of the existing facilities to which the proposed facilities are to be connected.
    (9) If Exhibit G does not reflect the maximum deliveries which applicant's existing and proposed facilities would be capable of achieving under most favorable operating conditions with utilization of all facilities, include an additional diagram or diagrams to depict such maximum capabilities. If the horsepower, pipelines, or other facilities on the segment of applicant's system under consideration are not being fully utilized due, e.g., to capacity limitation of connecting facilities or because of the need for standby or spare equipment, the reason for such nonutilization shall be stated.
    (10) Exhibits G and G-I shall be accompanied by a statement of engineering design data in explanation and support of the diagrams and the proposed project, setting forth:
    (i) Assumptions, bases, formulae, and methods used in the development and preparation of such diagrams and accompanying data.
    (ii) A description of the pipe and fittings to be installed, specifying the diameter, wall thickness, yield point, ultimate tensile strength, method of fabrication, and methods of testing proposed.
    (iv) Type, capacity, and location of each natural gas storage field or facility, and of each dehydration, desulphurization, natural gas liquefaction, hydrocarbon extraction, or other similar plant or facility directly attached to the applicant's system, indicating which of such plants are owned or operated by applicant, and which by others, giving their names and addresses.
    (v) If the daily design capacity shown in Exhibit G is predicated upon an ability to meet each customer's maximum contract quantity on the same day, explain the reason for such coincidental peak-day design. If the design day capacity shown in Exhibit G is predicated upon an assumed diversity factor, state that factor and explain its derivation.
    (vi) The maximum allowable operating pressure of each proposed facility for which a certificate is requested, as permitted by the Department of Transportation's safety standards. The applicant shall certify that it will design, install, inspect, test, construct, operate, replace, and maintain the facilities for which a certificate is requested in accordance with Federal safety standards and plans for maintenance and inspection or shall certify that it has been granted a waiver of the requirements of the safety standards by the Department of Transportation in accordance with the provisions of section 3(e) of the Natural Gas Pipeline Safety Act of 1968. Pertinent details concerning the waiver shall be set forth.
    (11) A statement by applicant describing:
    (i) Those production areas accessible to the proposed construction that contain sufficient existing or potential gas supplies for the proposed project; and
    (iii) This paragraph (a)(11) shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this paragraph (a)(11) and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this paragraph (a)(11) accordingly.
    (12) A system-wide estimate of the volumes of gas to be delivered during each of the first 3 full years of operation of the proposed service, sale, or facilities and during the years when the proposed facilities are under construction, and actual data of like import for each of the 3 years next preceding the filing of the application, together with:
    (i) Names and locations of customer companies and municipalities, showing the number of residential, commercial, firm industrial, interruptible industrial, residential space-heating, commercial space-heating, and other types of customers for each distribution system to be served at retail or wholesale; and the names and locations of each firm and interruptible direct industrial customer whose estimated consumption totals 10,000 Mcf or more in any calendar month or 100,000 Mcf or more per year together with an explanation of the end use to which each of these industrial customers will put the gas.
    (ii) Applicant's total annual and peak day gas requirements by classification of service in paragraph (a)(11)(i) of this section, divided as follows: Gas requirements for each distribution area where gas is sold by applicant at retail; for each wholesale customer; for all main line direct industrial customers; and company use and unaccounted-for gas, for both the applicant and each wholesale customer.
    (iii) Total past and expected curtailments of service by the applicant and each wholesale customer proposing to receive new or additional supplies of gas from the project, all to be listed by the classifications of service in paragraph (a)(12)(i) of this section.
    (iv) Explanation and derivation of basic factors used in estimating future requirements, including, for example: Peak-day and annual degree-day deficiencies, annual load factors of applicant's system and of its deliveries to its proposed customers; individual consumer peak-day and annual consumption factors for each class of consumers, with supporting historical data; forecasted saturation of space-heating as related to past experience; and full detail as to all other sources of gas supply available to applicant and to each of its customers, including manufacturing facilities and liquid petroleum gas.
    (v) Conformed copy of each contract, letter of intent or other agreement for sale or transportation of natural gas proposed by the application. Indicate the rate to be charged. If no agreements have been made, indicate the basis for assuming that contracts will be consummated and that service will be rendered under the terms contemplated in the application.
    (vi) A full description of all facilities, other than those covered by the application, necessary to provide service in the communities to be served, the estimated cost of such facilities, by whom they are to be constructed, and evidence of economic feasibility.
    (vii) A copy of each market survey made within the past three years for such markets as are to receive new or increased service from the project applied for.
    (viii) A statement showing the franchise rights of applicant or other person to distribute gas in each community in which service is proposed.
    (ix) When an application requires a statement of total peak-day or annual market requirements of affiliates, whose operations are integrated with those of applicant, to demonstrate applicant's ability to provide the service proposed or to establish a gas supply, estimates and data required by this paragraph (a)(12)(ix) shall also be stated in like detail for such affiliates.
    (x) When the proposed project is for service which would not decrease the life index of the total system gas supply by more than one year, the data required in paragraphs (a)(12)(i) to (ix), inclusive, of this section need be submitted only as to the particular market to receive new or additional service.
    (13) A statement identifying each Federal authorization that the proposal will require; the Federal agency or officer, or State agency or officer acting pursuant to delegated Federal authority, that will issue each required authorization; the date each request for authorization was submitted; why any request was not submitted and the date submission is expected; and the date by which final action on each Federal authorization has been requested or is expected.
    (14) A detailed estimate of total capital cost of the proposed facilities for which application is made, showing cost of construction by operating units such as compressor stations, main pipelines, laterals, measuring and regulating stations, and separately stating the cost of right-of-way, damages, surveys, materials, labor, engineering and inspection, administrative overhead, fees for legal and other services, allowance for funds used during construction, and contingencies. Include a brief statement indicating the source of information used as the basis for the above estimate. If not otherwise set forth, submit data on preliminary bids, if any, for the proposed facilities and recent experienced cost data for facilities of similar character.
    (15) Plans for financing the proposed facilities for which the application is filed, together with:
    (i) A description of the class (e.g., commercial paper, long-term debt, preferred stock) and cost rates for securities expected to be issued with construction period and post- operational sources of financing separately identified.
    (ii) Statement of anticipated cash flow, including provision during the period of construction and the first 3 full years of operation of proposed facilities for interest requirements, dividends, and capital requirements.
    (iv) Comparative pro forma balance sheets and income statements for the period of construction and each of the first 3 full years of operation, giving effect to the proposed construction and proposed financing of the project.
    (v) Any additional data and information upon which applicant proposes to rely in showing the adequacy and availability of resources for financing its proposed project.
    (vi) In instances for which principal operations of the company have not commenced or where proposed rates for services are developed on an incremental basis, a brief statement explaining how the applicant will determine the actual allowance for funds used during construction (AFUDC) rate, or if a rate is not to be used, how the applicant will determine the actual amount of AFUDC to be capitalized as a component of construction cost, and why the method is appropriate under the circumstances.
    (16) A concise statement setting forth arrangements for supervision, management, engineering, accounting, legal, or other similar service to be rendered in connection with the construction or operation of the project, if not to be performed by employees of applicant, including reference to any existing or contemplated agreements therefor, together with:
    (i) See Exhibit D, paragraph (a)(4) of this section.
    (ii) Conformed copies of all construction, engineering, management, and other similar service agreements or contracts in any way operative with respect to construction, operation, or financing of facilities which are the subject of the application or will be applicable under system operations.
    (17) When the estimated revenues and expenses related to a proposed facility will significantly affect the operating revenues or operating expenses of an applicant, there shall be submitted a system-wide statement for the last year preceding the proposed construction or service and pro forma system-wide and incremental statements for each of the first three full years of operation of the proposed facilities, showing:
    (i) Gas system annual revenues and volumes of natural gas related thereto, subdivided by classes of service, and further subdivided by sales to direct industrial customers, sales to other gas utilities, and other sales, indicating billing quantities used for computing charges, e.g., actual demands, billing demands, volumes, heat-content adjustment or other determinants. In addition, if enlargement or extension of facilities is involved, the revenues attributable solely to the proposed facilities shall be stated separately, and the basis and data used in such computation shall be clearly shown.
    (ii) Gas system annual operating expenses classified in accordance with the Commission's Uniform System of Accounts for Natural Gas Companies; the annual depreciation, depletion, taxes, utility income, and resulting rate of return on net investment in gas plant including working capital. In addition if enlargement or extension of facilities is involved, the cost of service attributable solely to the proposed facilities shall be stated separately with supporting data.
    (iii) When the data required in paragraphs (a)(17)(i) and (ii) of this section is not submitted, applicant shall provide in lieu thereof a statement in sufficient detail to show clearly the effect on the operating revenues and operating expenses of the estimated revenues and expenses related to the proposed facility.
    (18) Depreciation and depletion rates to be established, the method of determination and the justification therefor.
    (A) Identification of the applicable presently effective rate schedules, when no additional tariff filings will be required, or
    (B) When changes are required in applicant's presently effective tariff, or if applicant has no tariff, pro forma copies of appropriate changes in or additions to the effective tariff or a pro forma copy of the new gas tariff proposed, or
    (C) Such statement shall clearly show whether such rate results from negotiation, cost-of-service determination, competitive factors or others, and shall give the nature of any studies which have been made in connection therewith.
    (ii) When new rates or changes in present rates are proposed or when the proposed facilities will result in a material change in applicant's average cost of service, such statement shall be accompanied by supporting data showing:
    (A) System cost of service for the first calendar year of operation after the proposed facilities are placed in service.
    (B) An allocation of such costs to each particular service classification, with the basis for each allocation clearly stated.
  • In addition to the exhibits required by § 157.14, every application involving acquisition of facilities must be accompanied by the exhibits listed below. Together with each exhibit applicant must provide a full and complete explanation of the data submitted, the manner in which it was obtained, and the reasons for the conclusions derived from the exhibits, unless the applicant includes a statement identifying the schedule and rate containing the required information and data filed as prescribed in § 385.2011 of this chapter. If the Commission determines that a formal hearing upon the application is required or that testimony and hearing exhibits should be filed, the Secretary will promptly notify the applicant that submittal of all the exhibits and testimony of all witnesses to be sponsored by the applicant in support of his case-in-chief is required. Submittal of these exhibits and testimony must be within 20 days from the date of the Secretary's notice, or any other time specified by the Secretary in the notice. Sections 157.6(a) and 385.2011 of this chapter will govern the submissions required to be furnished to the Commission. Interveners and persons becoming interveners after the date of the Secretary's notice must be advised by the applicant of the afore-specified exhibits and testimony, and must be furnished with copies upon request. If this section requires an applicant to reveal Critical Energy Infrastructure Information (CEII), as defined by § 388.113(c) of this chapter, to any person, the applicant shall follow the procedures set out in § 157.10(d).
  • In cases of emergency and pending the determination of any application on file with the Commission for a certificate of public convenience and necessity pursuant to section 7 of the Natural Gas Act, application may be made for a temporary certificate authorizing the construction and operation of extensions of existing facilities, interconnections of pipeline systems, or sales of natural gas that may be required to assure maintenance of adequate service, or to service particular customers. This application must be submitted in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter.
  • Applications for an order authorizing abandonment of facilities or service pursuant to section 7(b) of the Natural Gas Act must contain a statement providing in detail the reasons for the abandonment and must contain the exhibits listed below, unless the applicant includes a statement identifying the schedule and rate containing the required information and data filed as prescribed in § 385.2011 of this chapter. Any application for an abandonment that is not excluded by § 380.4(a)(28) or (29), must include an environmental report as specified by § 380.3(c)(2). Sections 157.6(a) and 385.2011 of this chapter will govern the submission of applications and exhibits required to be furnished. Together with each exhibit, applicant must provide a full and complete explanation of the data submitted, the manner in which it was obtained, and the reasons for the conclusions derived from the data. The Secretary may, in addition, require that the testimony of all witnesses to be presented by the applicant be filed together with all exhibits upon which applicant will base its case-in-chief.
  • (c) Applicant must file with the Commission, in writing and under oath, an original and four conformed copies, as prescribed in § 385.2011 of this chapter and, upon request must furnish an intervener with a single copy, of the following:
    (1) Within ten days after the bona fide beginning of construction, notice of the date of such beginning;
    (2) Within ten days after authorized facilities have been constructed and placed in service or any authorized operation, sale, or service has commenced, notice of the date of such placement and commencement and
    (3) Within six months after authorized facilities have been constructed, a statement showing, on the basis of all costs incurred to that date and estimated to be incurred for final completion of the project, the cost of constructing authorized facilities, such total costs to be classified according to the estimates submitted in the certificate proceeding and compared therewith and any significant differences explained.
  • (a) Any interstate pipeline which has been issued a certificate other than a limited-jurisdiction certificate, pursuant to section 7 of the Natural Gas Act and had rates accepted by the Commission may apply for a blanket certificate under this subpart in the manner prescribed in §§ 157.6(a), 157.14(a) and 385.2011 of this chapter.
  • (b) For any activity subject to the requirements of this section, the certificate holder must file with the Secretary of the Commission an original and seven copies, as prescribed in §§ 157.6(a) and 385.2011 of this chapter, a request for authorization under the notice procedures of this section that contains:
    (1) The exact legal name of the certificate holder and mailing address and telephone number of the person or persons to whom communications concerning the request are to be addressed;
    (2) The docket number in which its blanket certificate was issued;
    (3) Any information required in §§ 157.208 through 157.218 of this chapter for the particular activity;
    (4) A verified statement that the proposed activity complies with the requirements of this subpart;
    (5) A form of notice of the application suitable for publication in the Federal Register in accordance with the specifications in § 385.203(d) of this chapter. This paragraph (b)(5) shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this paragraph (b)(5) and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this paragraph (b)(5) accordingly; and
    (6) All related filings must be made within 10 days of the first filing. Otherwise the applications on file will be rejected under paragraph (c) of this section without prejudice to refiling when all parties are ready to proceed.
  • On or before May 1, or each year, or in the case of emergency reconstruction activity, prior to any activity, the certificate holder must file, in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter, an annual report signed under oath by a senior official of the company, that lists for the previous calendar year:
  • (e) For each facility completed during the calendar year pursuant to paragraph (a) of this section and § 157.213(a), the certificate holder shall file in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter as part of the required annual report under § 157.207(a) the information described in paragraphs (e)(1)-(5) of this section. For each facility completed during the calendar year pursuant to paragraph (b) of this section, and §§ 157.210, 157.212, and 157.213(b), the certificate holder shall file in the manner prescribed above only the information described in paragraph (e)(3) of this section.
    (1) A description of the facilities installed pursuant to this section, including a description of the length and size of pipelines, compressor horsepower, metering facilities, taps, valves, and any other facilities constructed;
    (2) The specific purpose, location, and beginning and completion date of construction of the facilities installed, the date service commenced, and, if applicable, a statement indicating the extent to which the facilities were jointly constructed;
    (3) The actual installed cost of each facility item listed pursuant to paragraph (e)(1), separately stating the cost of materials and labor as well as other costs allocable to the facilities;
    (i) A description of the contacts made, reports produced, and results of consultations which took place to ensure compliance with the Endangered Species Act, the National Historic Preservation Act and the Coastal Zone Management Act;
    (ii) Documentation, including images, that restoration of work areas is progressing appropriately;
    (iii) A discussion of problems or unusual construction issues, including those identified by affected landowners, and corrective actions taken or planned; and
    (iv) For new or modified compression, a noise survey verifying compliance with § 157.206(b)(5).
    (i) A statement referencing the date of issuance, docket number and title of the proceeding for any certificate issued by the Commission authorizing the facilities acquired; and
    (ii) The amounts recorded in the accounts of the vendor (seller or lessor) that apply to the facilities acquired and the accumulated provisions for depreciation, depletion, and amortization.
  • (b) As part of the certificate holder's annual report of projects authorized under paragraph (a) of this section, the certificate holder must report the following in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter;
    (1) A description of the temporary compression facility, including the size, type and number of compressor units;
    (2) The location at which temporary compression was installed, operated and removed, including its location relative to existing facilities;
    (3) A description of the permanent compression facility which was unavailable, and a statement explaining the reason for the temporary compression;
    (4) The dates for which the temporary compression was installed, operated and removed; and
    (5) If applicable, the information required in § 157.208(e)(4).
  • (c) As part of the certificate holder's annual report of projects authorized under paragraph (a) of this section, the certificate holder must report in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter:
    (1) A description of the facilities acquired, constructed, replaced, modified or operated pursuant to this section;
    (2) The location and maximum quantities delivered at such delivery point;
    (3) The actual cost and the completion date of the delivery point; and
    (4) The date of each agreement obtained pursuant to § 157.206(b)(3) and the date construction began.
  • (c) For any storage facility whose capacity is increased pursuant to this section, the certificate holder shall submit, in the manner prescribed in § 385.2011 of this chapter, semi-annual reports (to coincide with the termination of the injection and withdrawal cycles) containing the information listed in subdivisions (1) through (8) of this paragraph. The certificate holder shall continue to file semi-annual reports until the storage inventory volume has reached, or closely approximates, the maximum specified in the request. Thereafter, the reports shall continue on a semi-annual basis for a period of one year. The filing of reports shall be discontinued thereafter unless otherwise ordered by the Commission. (Volumes shall be stated at 14.73 psia and 60 °F, and pressures shall be stated in psia.)
    (3) The maximum daily injection or withdrawal rate experienced during the reporting period and the average working pressure on such maximum days taken at a central measuring point where the total volume injected or withdrawn is measured.
    (4) Results of any tracer program by which the leakage of injected gas may be determined. If the leakage of gas exists, the report should show the estimated total volume of gas leakage, the volume of recycled gas and the remaining inventory of gas in the reservoir at the end of the reporting period.
    (5) Any surveys of pressures in gas wells, water levels in observation wells, pump test results for the aquifer-type reservoirs, and the results of back-pressure tests conducted during the reporting period.
    (6) The latest revised structure and isopachous contour maps showing the location of the wells, the location and extent of the gas bubble in the storage reservoir for aquifer-type reservoirs and in any other reservoirs of the project in which gas bubbles are known to exist. This map need not be filed if there is no material change from the map previously filed.
    (8) Such other data or reports which may aid the Commission in the evaluation of the storage project.
  • (1) For any storage project tested or developed pursuant to this section, the certificate holder shall file, in the manner prescribed in §§ 157.6(a) and 385.2011 of this chapter as part of the annual report required under § 157.207(a), the following information:
    (i) A description of the facilities constructed and the type of storage reservoir, i.e., gas expansion or dry gas, water-drive or aquifer;
    (ii) The location of the facilities;
    (iii) The cost of such facilities, the date construction began, and the date they were placed in service;
    (iv) The monthly volumes of gas injected into and withdrawn from each reservoir;
    (v) An estimate of the storage capacity and daily deliverability of each project; and
    (vi) A description of the contacts made, reports produced, and results of consultations which took place to ensure compliance with the Endangered Species Act, the National Historic Preservation Act and the Coastal Zone Management Act.
  • (a) When the operations sales, service, construction, extensions, acquisitions or abandonment proposed by an application do not require all the data and information specified by this part to disclose fully the nature and extent of the proposed undertaking, an abbreviated application may be filed in the manner prescribed in § 385.2011 of this chapter, provided it contains all information and supporting data necessary to explain fully the proposed project, its economic justification, its effect upon applicant's present and future operations and upon the public proposed to be served, and is otherwise in conformity with the applicable requirements of this part regarding form, manner of presentation, and filing. Such an application shall (1) state that it is an abbreviated application; (2) specify which of the data and information required by this part are omitted; and (3) relate the facts relied upon to justify separately each such omission.
  • (4) This report must be filed as prescribed in § 385.2011 of this chapter as indicated in the General Instructions set out in the quarterly financial report form, and must be properly completed and verified. Filing on electronic media pursuant to § 385.2011 of this chapter will be required commencing with the quarterly financial report ending March 31, 2004, due on or before July 9, 2004 for major natural gas companies, and due on or before July 23, 2004 for nonmajor natural gas companies. One copy of the report must be retained by the respondent in its files.
  • (2) 552 must be filed as prescribed in § 385.2011 of this chapter as indicated in the General Instructions set out in the annual reporting form, and must be properly completed and verified. Each market participant must file Form No. 552 by May 1, 2009 for calendar year 2008 and by May 1 of each year thereafter for the previous calendar year. Each report must be prepared in conformance with the Commission's software and guidance posted and available for downloading from the FERC Web site (http://www.ferc.gov). One copy of the report must be retained by the respondent in its files.
  • (d) On or before May 1 of each year, a company must file (on electronic media pursuant to § 385.2011 of this chapter, accompanied by 7 paper copies) an annual report that lists for the previous calendar year each activity that is described in paragraph (a) of this section, and which was completed during the previous calendar year and exempt from the advance notification requirement pursuant to paragraph (b)(2) of this section. For each such activity, the company must include all of the information described in paragraph (c) of this section.
  • (3) 549D report must be filed as prescribed in § 385.2011 of this chapter as indicated in the General Instructions and Data Dictionary set out in the quarterly reporting form. Each report must be prepared and filed in conformance with the Commission's software or XML Schema, eTariff filing structure, and reporting guidance, so as to be posted and available for downloading from the FERC Web site (http://www.ferc.gov). One copy of the report must be retained by the respondent in its files.
  • (1) This report form must be filed as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in the report form, and must be properly completed and verified.
  • (v) This report must be filed as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in the quarterly report form, and must be properly completed and verified. Filing on electronic media pursuant to § 385.2011 of this chapter will be required commencing with the reporting quarter ending March 31, 2004, due on or before
  • (ii) The annual report in effect must be filed with the Commission as prescribed in § 385.2011 of this chapter and as indicated in the General Instructions set out in the form, and must be properly completed and verified. Filing on electronic media pursuant to § 385.2011 of this chapter is required.
  • (r) Deny or grant, in whole or in part, motions for extension of time to file, or requests for waiver of the requirements of the following forms, data collections, and reports: Annual Reports (Form Nos. 1, 1-F, 2, 2-A, and 6); Quarterly Reports (Form Nos. 3-Q and 6-Q); Annual Report of Centralized Service Companies (Form No. 60); Narrative Description of Service Company Functions (FERC-61); and Electric Quarterly Reports, as well as, where required, the electronic filing of such information (§ 385.2011 of this chapter, Procedures for filing on electronic media, paragraphs (a)(6), (c), and (e)).