§2.55. Auxiliary installations and replacement facilities. — Inbound Citations

18 C.F.R. § 2.55

Cited by 11 regulations in release Current.

Citations to 18 C.F.R. § 2.55 as a whole

  • (i) No landowner notice is required for replacements which would have been done under § 2.55 of this chapter but for the fact that the replacement facilities are not of the same capacity as long as they meet the location requirements of § 2.55(b)(1)(ii) of this chapter and do not cause any ground disturbance; or any replacement done for safety, DOT compliance, environmental, or unplanned maintenance reasons that are not foreseen and that require immediate attention by the certificate holder.
  • (1) Except as identified in §§ 380.4, 380.6 and 2.55 of this chapter, authorization for the site of new gas import/export facilities under DOE Delegation No. 0204-112 and authorization under section 7 of the Natural Gas Act for the construction, replacement, or abandonment of compression, processing, or interconnecting facilities, onshore and offshore pipelines, metering facilities, LNG peak-shaving facilities, or other facilities necessary for the sale, exchange, storage, or transportation of natural gas;

Citations to §2.55(a)

  • (a) The definition of auxiliary installations in § 2.55(a) for which no certificate authority is necessary includes such defense-related facilities as (1) fallout shelters at compressor stations and other operating and maintenance camps; (2) emergency company headquarters or other similar installations; and (3) emergency communication equipment.
  • (i) Eligible facility means, except as provided in paragraph (b)(2)(ii) of this section, any facility subject to the Natural Gas Act jurisdiction of the Commission that is necessary to provide service within existing certificated levels. Eligible facility also includes any gas supply facility or any facility, including receipt points, needed by the certificate holder to receive gas into its system for further transport or storage, and interconnecting facilities between transporters that transport natural gas under part 284 of this chapter. Further, eligible facility includes main line, lateral, and compressor replacements that do not qualify under § 2.55(b) of this chapter because they will result in an incidental increase in the capacity of main line facilities, or because they will not satisfy the location or work space requirements of § 2.55(b). Replacements must be done for sound engineering purposes. Replacements for the primary purpose of creating additional main line capacity are not eligible facilities; however, replacements and the modification of facilities to rearrange gas flows or increase compression for the primary purpose of restoring service in an emergency due to sudden unforeseen damage to main line facilities are eligible facilities. Eligible facility also includes auxiliary installations and observation wells which do not qualify under § 2.55(a) of this chapter because they will not satisfy the location or work space requirements of § 2.55(a). Finally, for purposes of abandonment under § 157.216, eligible facilities include auxiliary installations that do not qualify for pre-granted abandonment authority under § 2.55(a)(3) and replacement facilities constructed under § 2.55(b).
  • (i) An auxiliary facility as described in § 2.55(a) of this chapter when the abandonment:
    (A) Will not exceed the cost limit in § 157.208(d) for activities under the automatic provisions;
    (B) Will have no adverse impact on customers' certificated services; and
    (C) Cannot satisfy the right-of-way, facility site, and work space limitations for the pre-granted abandonment authority in § 2.55(a)(3);

Citations to §2.55(a)(3)

  • (i) Eligible facility means, except as provided in paragraph (b)(2)(ii) of this section, any facility subject to the Natural Gas Act jurisdiction of the Commission that is necessary to provide service within existing certificated levels. Eligible facility also includes any gas supply facility or any facility, including receipt points, needed by the certificate holder to receive gas into its system for further transport or storage, and interconnecting facilities between transporters that transport natural gas under part 284 of this chapter. Further, eligible facility includes main line, lateral, and compressor replacements that do not qualify under § 2.55(b) of this chapter because they will result in an incidental increase in the capacity of main line facilities, or because they will not satisfy the location or work space requirements of § 2.55(b). Replacements must be done for sound engineering purposes. Replacements for the primary purpose of creating additional main line capacity are not eligible facilities; however, replacements and the modification of facilities to rearrange gas flows or increase compression for the primary purpose of restoring service in an emergency due to sudden unforeseen damage to main line facilities are eligible facilities. Eligible facility also includes auxiliary installations and observation wells which do not qualify under § 2.55(a) of this chapter because they will not satisfy the location or work space requirements of § 2.55(a). Finally, for purposes of abandonment under § 157.216, eligible facilities include auxiliary installations that do not qualify for pre-granted abandonment authority under § 2.55(a)(3) and replacement facilities constructed under § 2.55(b).
  • (C) Cannot satisfy the right-of-way, facility site, and work space limitations for the pre-granted abandonment authority in § 2.55(a)(3);

Citations to §2.55(b)

  • (i) Eligible facility means, except as provided in paragraph (b)(2)(ii) of this section, any facility subject to the Natural Gas Act jurisdiction of the Commission that is necessary to provide service within existing certificated levels. Eligible facility also includes any gas supply facility or any facility, including receipt points, needed by the certificate holder to receive gas into its system for further transport or storage, and interconnecting facilities between transporters that transport natural gas under part 284 of this chapter. Further, eligible facility includes main line, lateral, and compressor replacements that do not qualify under § 2.55(b) of this chapter because they will result in an incidental increase in the capacity of main line facilities, or because they will not satisfy the location or work space requirements of § 2.55(b). Replacements must be done for sound engineering purposes. Replacements for the primary purpose of creating additional main line capacity are not eligible facilities; however, replacements and the modification of facilities to rearrange gas flows or increase compression for the primary purpose of restoring service in an emergency due to sudden unforeseen damage to main line facilities are eligible facilities. Eligible facility also includes auxiliary installations and observation wells which do not qualify under § 2.55(a) of this chapter because they will not satisfy the location or work space requirements of § 2.55(a). Finally, for purposes of abandonment under § 157.216, eligible facilities include auxiliary installations that do not qualify for pre-granted abandonment authority under § 2.55(a)(3) and replacement facilities constructed under § 2.55(b).
  • (ii) A replacement facility that was or could have been constructed under § 2.55(b) of this chapter, provided the current cost to construct the facilities would not exceed the cost limit in § 157.208(d) for activities under the automatic provisions and the certificate holder obtains the written consent of each customer served using the facility during the past 12 months;
  • (3) An anticipated loss of natural gas supply or capacity due to a foreseeable facility outage resulting from a landslide or riverbed erosion or other natural forces beyond the participant's control. Participants may seek a temporary certificate under §§ 157.17 of this chapter if the facilities to remedy the emergency cannot be constructed automatically under § 2.55(b) or § 157.208(a) of this chapter.

Citations to §2.55(b)(1)(ii)

  • (i) No landowner notice is required for replacements which would have been done under § 2.55 of this chapter but for the fact that the replacement facilities are not of the same capacity as long as they meet the location requirements of § 2.55(b)(1)(ii) of this chapter and do not cause any ground disturbance; or any replacement done for safety, DOT compliance, environmental, or unplanned maintenance reasons that are not foreseen and that require immediate attention by the certificate holder.