US Codex
C.F.R.
Browse by date
Notes

§12.40. Time for inspections and reports. — Inbound Citations

18 C.F.R. § 12.40

Cited by 1 regulation in release Current.

Citations to §12.40(d)

  • (c) If the Regional Engineer determines that the preliminary report does not clearly demonstrate that the independent consultant team is adequately prepared for the inspection, the Regional Engineer may require the inspection to be postponed. Any such postponement shall not constitute good cause for an extension of time under § 12.40(d).