§12.37. Comprehensive assessment. — Inbound Citations
18 C.F.R. § 12.37
Statutory Authority
Cited by 9 regulations in release Current.
Citations to 18 U.S.C. § 12.37 as a whole
-
(f) Comprehensive assessment means a project review, inspection, and assessment that meets the requirements of § 12.37 and is performed by an independent consultant team.
-
(2) Movement;
-
(a) The comprehensive assessment report must include documentation of all the items listed in § 12.37.
-
(B) Any Owner's Dam Safety Program filed under subpart F of this part;
Citations to §12.37(a)(2)(i)
-
(c) The comprehensive assessment report must include the independent consultant team's evaluation of the assumptions, methods, calculations, results, and conclusions of the items listed in § 12.37(a)(2)(i) through (iv). The evaluation must:(1) Address the accuracy, relevance, and consistency with the current state of the practice of dam engineering;(2) Be accompanied by sufficient documentation of the independent consultant team's rationale, including, as needed, new calculations by the independent consultant team to verify that the assumptions, methods, calculations, results, and conclusions in the analyses of record are correct; and(3) If the independent consultant team is unable to review the analyses of record for any of the items listed in § 12.37(a)(2)(i) through (iv); or if the independent consultant team disagrees with the assumptions, methods, calculations, results, or conclusions therein; the independent consultant(s) must recommend that the licensee complete new analyses to address the identified concerns.
Citations to §12.37(a)(2)(ii)
-
(c) The comprehensive assessment report must include the independent consultant team's evaluation of the assumptions, methods, calculations, results, and conclusions of the items listed in § 12.37(a)(2)(i) through (iv). The evaluation must:(1) Address the accuracy, relevance, and consistency with the current state of the practice of dam engineering;(2) Be accompanied by sufficient documentation of the independent consultant team's rationale, including, as needed, new calculations by the independent consultant team to verify that the assumptions, methods, calculations, results, and conclusions in the analyses of record are correct; and(3) If the independent consultant team is unable to review the analyses of record for any of the items listed in § 12.37(a)(2)(i) through (iv); or if the independent consultant team disagrees with the assumptions, methods, calculations, results, or conclusions therein; the independent consultant(s) must recommend that the licensee complete new analyses to address the identified concerns.
Citations to §12.37(a)(2)(iii)
-
(c) The comprehensive assessment report must include the independent consultant team's evaluation of the assumptions, methods, calculations, results, and conclusions of the items listed in § 12.37(a)(2)(i) through (iv). The evaluation must:(1) Address the accuracy, relevance, and consistency with the current state of the practice of dam engineering;(2) Be accompanied by sufficient documentation of the independent consultant team's rationale, including, as needed, new calculations by the independent consultant team to verify that the assumptions, methods, calculations, results, and conclusions in the analyses of record are correct; and(3) If the independent consultant team is unable to review the analyses of record for any of the items listed in § 12.37(a)(2)(i) through (iv); or if the independent consultant team disagrees with the assumptions, methods, calculations, results, or conclusions therein; the independent consultant(s) must recommend that the licensee complete new analyses to address the identified concerns.
Citations to §12.37(a)(2)(iv)
-
(c) The comprehensive assessment report must include the independent consultant team's evaluation of the assumptions, methods, calculations, results, and conclusions of the items listed in § 12.37(a)(2)(i) through (iv). The evaluation must:(1) Address the accuracy, relevance, and consistency with the current state of the practice of dam engineering;(2) Be accompanied by sufficient documentation of the independent consultant team's rationale, including, as needed, new calculations by the independent consultant team to verify that the assumptions, methods, calculations, results, and conclusions in the analyses of record are correct; and(3) If the independent consultant team is unable to review the analyses of record for any of the items listed in § 12.37(a)(2)(i) through (iv); or if the independent consultant team disagrees with the assumptions, methods, calculations, results, or conclusions therein; the independent consultant(s) must recommend that the licensee complete new analyses to address the identified concerns.
Citations to §12.37(b)
-
(4) The design and construction practices used during original construction and subsequent modifications, in comparison with the industry best practices in use at the time of the inspection under this subpart D;