§12.31. Definitions. — Inbound Citations
18 C.F.R. § 12.31
Statutory Authority
Cited by 12 regulations in release Current.
Citations to §12.31(a)
-
(a) The licensee must obtain written approval of the independent consultant team, and the facilitator(s) for a potential failure mode analysis or risk analysis, from the Director of the Division of Dam Safety and Inspections, prior to the performance of a periodic inspection or comprehensive assessment under this subpart D.
Citations to §12.31(a)(2)
-
(d) The Director of the Division of Dam Safety and Inspections may, for good cause shown, grant a waiver of the 10-year requirement in § 12.31(a)(2). Any petition for waiver under this paragraph must be filed in accordance with § 385.207 of this chapter.
Citations to §12.31(a)(3)
-
(2) Includes additional qualified engineering and scientific professionals as supporting team members, as needed, who meet the requirements of paragraphs (a)(3) through (5) of this section;
-
(iv) Show that each member of the independent consultant team who is not designated as an independent consultant meets the requirements as defined in § 12.31(a)(3) through (5); and
Citations to §12.31(a)(4)
-
(2) Includes additional qualified engineering and scientific professionals as supporting team members, as needed, who meet the requirements of paragraphs (a)(3) through (5) of this section;
-
(iv) Show that each member of the independent consultant team who is not designated as an independent consultant meets the requirements as defined in § 12.31(a)(3) through (5); and
Citations to §12.31(a)(5)
-
(2) Includes additional qualified engineering and scientific professionals as supporting team members, as needed, who meet the requirements of paragraphs (a)(3) through (5) of this section;
-
(iv) Show that each member of the independent consultant team who is not designated as an independent consultant meets the requirements as defined in § 12.31(a)(3) through (5); and
Citations to §12.31(b)(3)
-
(ii) Show that the independent consultant meets the requirements as defined in §§ 12.31(a) and 12.31(b)(3).
Citations to §12.31(c)
-
(h) Any exempted small hydroelectric power project that utilizes a dam that is more than 33 feet in height above streambed, as defined in 18 CFR 12.31(c) of this chapter, impounds more than 2,000 acre-feet of water, or has a significant or high hazard potential, as defined in 33 CFR part 222, is subject to part 12 of the Commission's regulations, part 12 of this title (as they may be amended from time to time).
-
(a) Has a dam(1) That is more than 32.8 feet (10 meters) in height above streambed, as defined in § 12.31(c); or(2) With an impoundment gross storage capacity of more than 2,000 acre-feet (2.5 million cubic meters), as defined in § 12.31(d);
Citations to §12.31(d)
-
(2) With an impoundment gross storage capacity of more than 2,000 acre-feet (2.5 million cubic meters), as defined in § 12.31(d);