§12.13. Verification form. — Inbound Citations

18 C.F.R. § 12.13

Cited by 4 regulations in release Current.

Citations to 18 C.F.R. § 12.13 as a whole

  • (2) Following the initial report required in paragraph (a)(1) of this section, the applicant or licensee must submit to the Regional Engineer a written report on the condition affecting the safety of the project or project works verified in accordance with § 12.13. The written report must be submitted within the time specified by the Regional Engineer and must contain any information the Regional Engineer directs, including:
    (i) The causes of the condition;
    (ii) A description of any unusual occurrences or operating circumstances preceding the condition;
    (iii) An account of any measure taken to prevent worsening of the condition;
    (iv) A detailed description of any damage to project works and the status of any repair;
    (v) A detailed description of any personal injuries;
    (vi) A detailed description of the nature and extent of any private property damages; and
  • (a) Regardless of whether a particular modification is permitted without specific prior Commission approval, an applicant or licensee must report any modification of the project or project works to the Regional Engineer in writing, verified in accordance with § 12.13, at the time specified in paragraph (b) of this section.
  • (a) Unless provided with a written exemption pursuant to § 12.21, every applicant or licensee must develop and file with the Regional Engineer an emergency action plan and appendices, verified in accordance with § 12.13.
  • (2) If an applicant or licensee does not operate each spillway gate on a test basis during an inspection by the Commission staff, the applicant or licensee must submit to the Regional Engineer at least once each year a written statement, verified in accordance with § 12.13, that each spillway gate has been operated at least once during the twelve months preceding the inspection.