§77.23. Heliport imaginary surfaces. — Inbound Citations
14 C.F.R. § 77.23
Statutory Authority
Cited by 4 regulations in release Current.
Citations to 14 U.S.C. § 77.23 as a whole
-
-
-
(a) Grading, drainage, and associated items of site preparation are eligible for inclusion in a project, but only with respect to one landing strip at any airport, unless the airport qualifies for more than one runway, based on traffic volume or wind conditions (as outlined in § 151.77) and the overall site preparation required for development in accordance with the airport layout plan. The complete clearance of runway clear zone areas is desirable, but, as a minimum, all obstructions as determined by § 77.23 as applied to § 77.27 (b) and (c) of this chapter must be removed. Grading in runway clear zones is eligible only to remove terrain that is an obstruction. The clear zone is not a graded overrun area. Specific site preparation for an airport terminal building is eligible on the same basis as the building itself. The site preparation cost is prorated based on eligible and ineligible building space. Appendix B of this part sets forth typical eligible and ineligible items of site preparation as covered by this section.
-
(a) The removal or relocation, or both, of obstructions, as defined in Technical Standard Order N18 is eligible under the Program in cases where definite arrangements are made to prevent the obstruction from being recreated. In a case where removal is not feasible, the cost of marking or lighting it is eligible. The removal and relocation of structures necessary for essential airport development is eligible. The removal of structures that are not obstructions under § 77.23 of this chapter as applied to § 77.27 of this chapter are eligible when they are located within a runway clear zone.