§29.59. Takeoff path: Category A. — Inbound Citations
14 C.F.R. § 29.59
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 14 U.S.C. § 29.59 as a whole
-
(3) The operating engines must be at the greatest power for which approval is sought (or at full throttle when above the critical altitude) for the same period as this power is used in determining the takeoff climbout path under § 29.59.
-
(a) The takeoff data required by §§ 29.53, 29.55, 29.59, 29.60, 29.61, 29.62, 29.63, and 29.67 must be determined—(1) At each weight, altitude, and temperature selected by the applicant; and
-
-
Citations to §29.59(a)
-
(1) The requirements of § 29.59(a) must be met;