§900.6. Project proponent resource reports. — Inbound Citations
10 C.F.R. § 900.6
Statutory Authority
Cited by 9 regulations in release Current.
Citations to 10 U.S.C. § 900.6 as a whole
-
(iii) The IIP Process final resource reports developed under § 900.6;
-
(ii) Potentially affected landowner means an owner of a real property interest that is potentially affected directly (e.g., crossed or used) or indirectly (e.g., changed in use) by a project right-of-way, potential route, or proposed ancillary or access site, as identified in § 900.6.Project area means the area located between the two end points of the proposed electric transmission facility containing the study corridors selected by the project proponent for in-depth consideration for the proposed project and the immediate surroundings of the end points of the proposed facility. The project area does not necessarily coincide with “permit area,” “area of potential effect,” “action area,” or other terms specific to a certain type of regulatory review.Project proponent means a person or entity who initiates the IIP Process in anticipation of seeking a Federal authorization for a proposed electric transmission project.Qualifying project means:
-
(3) DOE will establish all analysis areas necessary for the completion of resource reports required under § 900.6;
-
(a) An Integrated Interagency Pre-Application (IIP) Process review meeting is required for each proposed electric transmission project utilizing the IIP Process and may only be held after the project proponent submits a review meeting request to DOE. The project proponent may submit the request at any time following submission of the initial resource reports required under § 900.6. The review meeting request must include:(1) A summary table of changes made to the proposed project since the IIP Process initial meeting, including potential environmental and community benefits from improved siting or design;(2) Maps of potential routes and study corridors, including the proposed line, substations, and other infrastructure, as applicable, with at least as much detail as required for the initiation request described by § 900.5 and as modified in response to early stakeholder input and outreach and feedback from relevant Federal entities and relevant non-Federal entities;(3) If known, a schedule for completing any upcoming field resource surveys, as appropriate;(4) A conceptual plan for implementation and monitoring of proposed mitigation measures to avoid, minimize, or compensate for effects of the proposed project, consistent with 40 CFR 1508.1(s) or any successor regulation. This may include compensatory mitigation measures (offsite and onsite);(5) An updated public engagement plan described in § 900.5(d)(2), reflecting actions undertaken since the project proponent submitted the initiation request and input received from relevant Federal entities and relevant non-Federal entities;(i) The dates on which the project proponent filed applications or requests for Federal authorizations and the dates on which the project proponent filed revisions to previously filed applications or requests; and(ii) Estimated dates for filing remaining applications or requests for Federal authorization;(7) Estimated dates that the project proponent will file requests for authorizations and consultations with relevant non-Federal entities; and(8) A proposed duration for each Federal land use authorization expected to be required for the proposed project, commensurate with the anticipated use of the proposed electric transmission facility.
-
(b) Not later than 10 calendar days after the date that DOE receives the close-out meeting request, DOE shall provide relevant Federal entities and relevant non-Federal entities with materials included in the request and any updated resource reports submitted under § 900.6 via electronic means.
Citations to §900.6(f)(1)
-
(4) Provide the following information for each facility described under paragraphs (f)(1) through (3) of this section:(i) A brief description of the facility, including, as appropriate, ownership, land requirements, megawatt size, construction status, and an update of the latest status of Federal, State, and local permits and approvals; and(ii) Current topographic maps showing the location of the facility;
Citations to §900.6(f)(2)
-
(4) Provide the following information for each facility described under paragraphs (f)(1) through (3) of this section:(i) A brief description of the facility, including, as appropriate, ownership, land requirements, megawatt size, construction status, and an update of the latest status of Federal, State, and local permits and approvals; and(ii) Current topographic maps showing the location of the facility;
Citations to §900.6(f)(3)
-
(4) Provide the following information for each facility described under paragraphs (f)(1) through (3) of this section:(i) A brief description of the facility, including, as appropriate, ownership, land requirements, megawatt size, construction status, and an update of the latest status of Federal, State, and local permits and approvals; and(ii) Current topographic maps showing the location of the facility;