§76.5. Communications. — Inbound Citations
10 C.F.R. § 76.5
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 10 U.S.C. § 76.5 as a whole
-
(2) A report required by paragraph (a), (b) or (c) of this section must be followed by a written report within 30 days of the initial report. Written reports prepared pursuant to other regulations may be submitted to fulfill this requirement if the reports contain all of the necessary information and the appropriate distribution is made. These written reports must be sent to the NRC by an appropriate method listed in § 76.5. The reports must include the following information:(i) A description of the event, including the probable cause and the manufacturer and model number (if applicable) of any equipment that failed or malfunctioned;(ii) The exact location of the event;(iii) A description of isotopes, quantities and chemical and physical form of the material involved;(iv) The date and time of the event;(v) The causes, including the direct cause, the contributing cause, and the root cause;(vi) Corrective actions taken or planned and the results of any evaluations or assessments;(vii) The extent of exposure of individuals to radiation or to radioactive materials without identification of individuals by name; and
-
-
(1) An application for a certificate of compliance must be tendered by filing the application with the Director of the NRC's Office of Nuclear Material Safety and Safeguards, with copies sent to the NRC Region III Office and appropriate resident inspector, in accordance with § 76.5. If the application is to be submitted electronically, see Guidance for Electronic Submissions to the Commission at http://www.nrc.gov/site-help/e-submittals.html.
-
(b) The Corporation shall notify the Commission promptly, in writing under § 76.5, when the Corporation decides to terminate operation at either of the gaseous diffusion plants and other activities authorized under the certificate.
-
(o) The Corporation may make changes to the emergency plan without prior Commission approval if the changes do not decrease the effectiveness of the plan. The Corporation shall furnish these changes to the NRC in accordance with § 76.5 and to affected offsite response organizations within 6 months after the change is made.