§74.53. Process monitoring. — Inbound Citations
10 C.F.R. § 74.53
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 10 C.F.R. § 74.53 as a whole
-
(3) The quantity of SSNM (less than 0.05 formula kilograms) in each container requires protracted diversions to accumulate five formula kilograms.Category IB material means all SSNM material other than Category IA.Commission means the Nuclear Regulatory Commission or its duly authorized representatives.Continuous process means a unit process in which feed material must be introduced in a systematic manner in order to maintain equilibrium conditions.Controlled access area means any temporarily or permanently established area which is clearly demarcated, access to which is controlled, and which affords isolation of the material or persons within it.DOE means the U.S. Department of Energy or its duly authorized representatives.Effective kilograms of special nuclear material means:
-
(b) To achieve the general performance objectives specified in § 74.51(a), the MC&A system must provide the capabilities described in §§ 74.53, 74.55, 74.57 and 74.59 and must incorporate checks and balances that are sufficient to detect falsification of data and reports that could conceal diversion by:(1) An individual, including an employee in any position; or(2) Collusion between an individual with MC&A responsibilities and another individual who has responsibility or control within both the physical protection and the MC&A systems.
-
-
Citations to §74.53(b)
-
(3) Provide the data necessary for performance of the material control tests required by § 74.53(b).