§74.45. Measurements and measurement control. — Inbound Citations
10 C.F.R. § 74.45
Statutory Authority
Cited by 5 regulations in release Current.
Citations to 10 C.F.R. § 74.45 as a whole
-
(c) To achieve the performance objectives specified in § 74.41(a), the MC&A system must include the capabilities described in §§ 74.43 and 74.45, and must incorporate checks and balances that are sufficient to detect falsification of data and reports that could conceal diversion of SNM by:(1) A single individual, including an employee in any position; or
-
Citations to §74.45(b)
-
(5) Establish records that will demonstrate that the performance objectives of § 74.41(a)(1) through (4), the system capabilities of paragraphs (b) and (c) of this section and § 74.45(b) and (c) have been met, and maintain these records in an auditable form, available for inspection, for at least 3 years, unless a longer retention time is specified by § 74.19(b), part 75 of this chapter, or by a specific license condition.
Citations to §74.45(c)
-
(ii) The measurement control program for uranium source material at an uranium enrichment facility and for special nuclear material at all applicable facilities as implemented pursuant to § 74.31(b), § 74.33(b), § 74.45(c), or § 74.59(e) of this chapter, as appropriate; and
-
(5) Establish records that will demonstrate that the performance objectives of § 74.41(a)(1) through (4), the system capabilities of paragraphs (b) and (c) of this section and § 74.45(b) and (c) have been met, and maintain these records in an auditable form, available for inspection, for at least 3 years, unless a longer retention time is specified by § 74.19(b), part 75 of this chapter, or by a specific license condition.