§55.45. Operating tests. — Inbound Citations

10 C.F.R. § 55.45

Cited by 22 regulations in release Current.

Citations to 10 C.F.R. § 55.45 as a whole

  • (2) The applicant has passed the requisite written examination and operating test in accordance with §§ 55.41 and 55.45 or 55.43 and 55.45. These examinations and tests determine whether the applicant for an operator's license has learned to operate a facility competently and safely, and additionally, in the case of a senior operator, whether the applicant has learned to direct the licensed activities of licensed operators competently and safely.
  • (a) The Commission shall use the criteria in NUREG-1021, “Operator Licensing Examination Standards for Power Reactors,” 1 in effect six months before the examination date to prepare the written examinations required by §§ 55.41 and 55.43 and the operating tests required by § 55.45. The Commission shall also use the criteria in NUREG-1021 to evaluate the written examinations and operating tests prepared by power reactor facility licensees pursuant to paragraph (b) of this section.
  • (b) The approved information collection requirements contained in this part appear in §§ 55.11, 55.25, 55.27, 55.31, 55.35, 55.40, 55.41, 55.43, 55.45, 55.47, 55.53, 55.57, and 55.59.

Citations to §55.45(a)

  • (2) The Commission will approve a simulation facility or use of the plant for administration of operating tests if it finds that the simulation facility and its proposed use, or the proposed use of the plant, are suitable for the conduct of operating tests for the facility licensee's reference plant under § 55.45(a).
  • (ii) The operating test will require the operator or senior operator to demonstrate an understanding of and the ability to perform the actions necessary to accomplish a comprehensive sample of items specified in § 55.45(a) (2) through (13) inclusive to the extent applicable to the facility.

Citations to §55.45(a)(1)

Citations to §55.45(a)(2)

Citations to §55.45(a)(3)

Citations to §55.45(a)(4)

Citations to §55.45(a)(5)

Citations to §55.45(a)(6)

Citations to §55.45(a)(7)

Citations to §55.45(a)(8)

Citations to §55.45(a)(9)

Citations to §55.45(a)(10)

Citations to §55.45(a)(11)

Citations to §55.45(a)(12)

Citations to §55.45(a)(13)

Citations to §55.45(b)

  • (4) Provide evidence that the applicant has successfully completed the facility licensee's requirements to be licensed as an operator or senior operator and of the facility licensee's need for an operator or a senior operator to perform assigned duties. An authorized representative of the facility licensee shall certify this evidence on Form NRC-398. This certification must include details of the applicant's qualifications, and details on courses of instruction administered by the facility licensee, and describe the nature of the training received at the facility, and the startup and shutdown experience received. In lieu of these details, the Commission may accept certification that the applicant has successfully completed a Commission-approved training program that is based on a systems approach to training and that uses a simulation facility acceptable to the Commission under § 55.45(b) of this part;

Citations to §55.45(b)(1)

  • (1) Facility licensees that propose to use a simulation facility, other than a plant-referenced simulator, or the plant in the administration of the operating test under §§ 55.45(b)(1) or 55.45(b)(3), shall request approval from the Commission. This request must include:
    (i) A description of the components of the simulation facility intended to be used, or the way the plant would be used for each part of the operating test, unless previously approved; and
    (ii) A description of the performance tests for the simulation facility as part of the request, and the results of these tests; and
    (iii) A description of the procedures for maintaining examination and test integrity consistent with the requirements of § 55.49.
  • (v) A simulator may be used in meeting the requirements of paragraphs (c) (3)(i) and (3)(ii) of this section, if it reproduces the general operating characteristics of the facility involved and the arrangement of the instrumentation and controls of the simulator is similar to that of the facility involved. If the simulator or simulation device is used to administer operating tests for a facility, as provided in § 55.45(b)(1), the device approved to meet the requirements of § 55.45(b)(1) must be used for credit to be given for meeting the requirements of paragraphs (c)(3)(i) (G through AA) of this section.

Citations to §55.45(b)(3)

  • (1) Facility licensees that propose to use a simulation facility, other than a plant-referenced simulator, or the plant in the administration of the operating test under §§ 55.45(b)(1) or 55.45(b)(3), shall request approval from the Commission. This request must include:
    (i) A description of the components of the simulation facility intended to be used, or the way the plant would be used for each part of the operating test, unless previously approved; and
    (ii) A description of the performance tests for the simulation facility as part of the request, and the results of these tests; and
    (iii) A description of the procedures for maintaining examination and test integrity consistent with the requirements of § 55.49.