§53.800. Facility licensees for self-reliant-mitigation facilities. — Inbound Citations

10 C.F.R. § 53.800

Cited by 11 regulations in release Current.

Citations to 10 U.S.C. § 53.800 as a whole

  • (b) The regulations in §§ 53.725 through 53.830 address areas related to staffing, training, personnel qualifications, and human factors engineering for applicants for or holders of OLs or COLs under this part. These regulations are organized as follows:
    (1) Sections 53.725 through 53.745 address general requirements for staffing, training, personnel qualifications, and human factors engineering. The regulations within these sections are applicable to all applicants for or holders of OLs or COLs under this part, except where specifically stated otherwise.
    (2) Sections 53.760 through 53.795 address operator and senior operator licensing requirements. The regulations within these sections are applicable to those applicants for or holders of OLs or COLs under this part for interaction-dependent-mitigation facilities that have not yet certified the permanent cessation of operations and permanent removal of fuel from the reactor vessel as described under § 53.1070.
    (3) Sections 53.800 through 53.820 address generally licensed reactor operator requirements. The regulations within these sections are in lieu of §§ 53.760 through 53.795 for those applicants for or holders of OLs or COLs under this part for self-reliant-mitigation facilities that have not yet certified the permanent cessation of operations and permanent removal of fuel from the reactor vessel as described under § 53.1070.
    (4) Section 53.830 provides general personnel training requirements. The regulations within this section are applicable to all applicants for or holders of OLs or COLs under this part.
  • (a) An applicant or licensee or facility licensee must submit any communication or report required by the regulations contained within §§ 53.725 through 53.830 and must submit any application filed under these regulations to the Commission.
  • The regulations in §§ 53.725 through 53.830 do not require a license for an individual who—
  • (a) Facility licensees must demonstrate compliance with the requirements of either §§ 53.760 through 53.795 for interaction-dependent-mitigation facilities or §§ 53.800 through 53.820 for self-reliant-mitigation facilities.
  • (a) A commercial nuclear plant is a self-reliant-mitigation facility if the NRC determined as part of its approval of the OL or COL for that plant that its design demonstrates compliance with the criteria in paragraphs (a)(1) though (a)(5) of this section. A self-reliant-mitigation facility is of a class, based upon the similarity of operating and technical characteristics of the plants in the class, such that its licensee must comply with the requirements of §§ 53.800 through 53.820 in lieu of those in §§ 53.760 through 53.795.
    (1) The safety performance criteria of §§ 53.210 and 53.220 must be met without reliance upon human action for credited event mitigation.
    (2) The results of the probabilistic risk assessment (PRA), other systematic risk evaluations, or a combination thereof required by § 53.450(a) must demonstrate that the evaluation criteria for the events analyzed in accordance with § 53.450 will be met without reliance on human actions to achieve acceptable event mitigation.
    (3) The functional requirements analysis and function allocation performed under § 53.730(d) must demonstrate that functions required for safety are not reliant upon credited human action.
    (4) The plant response to events analyzed under § 53.450 must rely exclusively on safety features and characteristics that will neither be rendered unavailable by credible human errors of commission or omission nor credibly require manual human operation in response to equipment failures. Compliance with this paragraph (a)(4) may be achieved through the use of SSCs that function through inherent characteristics or that have engineered protections against human failures.
    (5) Assessments of credited human actions within the analysis of design-basis accidents (DBAs) and across the range of LBEs other than DBAs do not identify important human actions needed to ensure appropriate defense in depth is provided, as required by § 53.250.
  • (6) Ensure that the facility design continues to meet the criteria of § 53.800.

Citations to §53.800(a)(1)

  • (a) Commercial nuclear plants licensed under this part are either of the class of self-reliant-mitigation facilities or of interaction-dependent-mitigation facilities, based upon the similarity of operating and technical characteristics of the plants in the class. A commercial nuclear plant is a self-reliant-mitigation facility if the U.S. Nuclear Regulatory Commission (NRC) determined as part of its approval of the OL or COL for that plant that its design demonstrates compliance with the criteria of § 53.800(a)(1) through (a)(5). Otherwise, the commercial nuclear plant is an interaction-dependent-mitigation facility.

Citations to §53.800(a)(2)

  • (a) Commercial nuclear plants licensed under this part are either of the class of self-reliant-mitigation facilities or of interaction-dependent-mitigation facilities, based upon the similarity of operating and technical characteristics of the plants in the class. A commercial nuclear plant is a self-reliant-mitigation facility if the U.S. Nuclear Regulatory Commission (NRC) determined as part of its approval of the OL or COL for that plant that its design demonstrates compliance with the criteria of § 53.800(a)(1) through (a)(5). Otherwise, the commercial nuclear plant is an interaction-dependent-mitigation facility.

Citations to §53.800(a)(3)

  • (a) Commercial nuclear plants licensed under this part are either of the class of self-reliant-mitigation facilities or of interaction-dependent-mitigation facilities, based upon the similarity of operating and technical characteristics of the plants in the class. A commercial nuclear plant is a self-reliant-mitigation facility if the U.S. Nuclear Regulatory Commission (NRC) determined as part of its approval of the OL or COL for that plant that its design demonstrates compliance with the criteria of § 53.800(a)(1) through (a)(5). Otherwise, the commercial nuclear plant is an interaction-dependent-mitigation facility.

Citations to §53.800(a)(4)

  • (a) Commercial nuclear plants licensed under this part are either of the class of self-reliant-mitigation facilities or of interaction-dependent-mitigation facilities, based upon the similarity of operating and technical characteristics of the plants in the class. A commercial nuclear plant is a self-reliant-mitigation facility if the U.S. Nuclear Regulatory Commission (NRC) determined as part of its approval of the OL or COL for that plant that its design demonstrates compliance with the criteria of § 53.800(a)(1) through (a)(5). Otherwise, the commercial nuclear plant is an interaction-dependent-mitigation facility.

Citations to §53.800(a)(5)

  • (a) Commercial nuclear plants licensed under this part are either of the class of self-reliant-mitigation facilities or of interaction-dependent-mitigation facilities, based upon the similarity of operating and technical characteristics of the plants in the class. A commercial nuclear plant is a self-reliant-mitigation facility if the U.S. Nuclear Regulatory Commission (NRC) determined as part of its approval of the OL or COL for that plant that its design demonstrates compliance with the criteria of § 53.800(a)(1) through (a)(5). Otherwise, the commercial nuclear plant is an interaction-dependent-mitigation facility.