§52.1. Definitions. — Inbound Citations

10 C.F.R. § 52.1

Cited by 4 regulations in release Current.

Citations to 10 C.F.R. § 52.1 as a whole

  • (3) Is available in a timely manner after the onset of station blackout; and
  • (f) Licensees shall not perform any decommissioning activities, as defined in § 52.1, that—
    (1) Foreclose release of the site for possible unrestricted use;
    (2) Result in significant environmental impacts not previously reviewed; or
    (3) Result in there no longer being reasonable assurance that adequate funds will be available for decommissioning.
  • (b) The regulations in part 52 that are not issued under Sections 161b, 161i, or 161o for the purposes of Section 223 are as follows: §§ 52.0, 52.1, 52.2, 52.3, 52.7, 52.8, 52.9, 52.10, 52.11, 52.12, 52.13, 52.15, 52.16, 52.17, 52.18, 52.21, 52.23, 52.24, 52.26 52.28, 52.29, 52.31, 52.33, 52.39, 52.41, 52.43, 52.45, 52.46, 52.47, 52.48, 52.51, 52.53, 52.54, 52.55, 52.57, 52.59, 52.61, 52.63, 52.71, 52.73, 52.75, 52.77, 52.79, 52.80, 52.81, 52.83, 52.85, 52.87, 52.93, 52.97, 52.98, 52.103, 52.104, 52.105, 52.107, 52.109, 52.131, 52.133, 52.135, 52.136, 52.137, 52.139, 52.141, 52.143, 52.145, 52.147, 52.151, 52.153, 52.155, 52.156, 52.157, 52.158, 52.159, 52.161, 52.163, 52.165, 52.167, 52.171, 52.173, 52.175, 52.177, 52.179, 52.181, 52.301, and 52.303.
  • (i) Changes for temporary use of the land for public recreational purposes;
    (ii) Site exploration, including necessary borings to determine foundation conditions or other preconstruction monitoring to establish background information related to the suitability of the site, the environmental impacts of construction or operation, or the protection of environmental values;
    (iii) Preparation of a site for construction of a facility, including clearing of the site, grading, installation of drainage, erosion, and other environmental mitigation measures, and construction of temporary roads and borrow areas;
    (iv) Erection of fences and other access control measures;
    (v) Excavation;
    (vi) Erection of support buildings (such as construction equipment storage sheds, warehouse and shop facilities, utilities, concrete mixing plants, docking and unloading facilities, and office buildings) for use in connection with the construction of the facility;
    (vii) Building of service facilities (such as paved roads, parking lots, railroad spurs, exterior utility and lighting systems, potable water systems, sanitary sewage treatment facilities, and transmission lines);
    (viii) Procurement or fabrication of components or portions of the proposed facility occurring at locations other than the final, in-place location at the facility; or
    (ix) Manufacture of a nuclear power reactor under a manufacturing license (ML) under subpart H of this part to be installed at the proposed site and to be part of the proposed facility.
    Custom combined license (custom COL) means a COL that does not reference a standard design approval, standard design certification, or manufacturing license.
    Decommission or decommissioning means to remove a plant or site safely from service and reduce residual radioactivity to a level that permits—