§436.20. Net savings.
10 C.F.R. § 436.20
For a retrofit project, net savings may be found by subtracting life cycle costs based on the proposed project from life cycle costs based on not having it. For a new building design, net savings is the difference between the life cycle costs of an alternative design and the life cycle costs of the basic design.
Notes, amendments, and revision history
Source
Source: 55 FR 48220, Nov. 20, 1990, unless otherwise noted.
Authority
Authority: 42 U.S.C. 7101 et seq.; 42 U.S.C. 8254; 42 U.S.C. 8258; 42 U.S.C. 8259b; 42 U.S.C. 8287, et seq.
Source
Source: 44 FR 60669, Oct. 19, 1979, unless otherwise noted.