(1)
Bulk-power system— The term bulk-power system has the meaning given the term in section 215(a) of the Federal Power Act (
16 U.S.C. 824o(a)).
(2)
Commission— The term Commission means the Federal Energy Regulatory Commission.
(3)
Electric Reliability Organization— The term Electric Reliability Organization has the meaning given the term in section 215(a) of the Federal Power Act (
16 U.S.C. 824o(a)).
(4)
High-value— The term high-value, with respect to an IT or OT system, means that the system is so critical to an organization that the loss or corruption of information within the system or loss of access to the system would have serious impacts on the ability of the organization to perform its mission or conduct business.
(5)
Information technology; IT—
(A)
In general— The term information technology or IT means any equipment or interconnected system or subsystem of equipment used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information.
(B)
Inclusions— The term information technology or IT includes, at a minimum, computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources.
(6)
Operational technology; OT—
(A)
In general— The term operational technology or OT means any programmable system or device that—
(i)
interacts with the physical environment (or manages devices that interact with the physical environment); and
(ii)
detects or causes a direct change through the monitoring or control of devices, processes, or events.
(B)
Inclusions— The term operational technology or OT includes, at a minimum, industrial control systems, building management systems, fire control systems, and physical access control mechanisms.
(7)
Post-quantum cryptography; PQC— The term post-quantum cryptography or PQC means cryptographic algorithms or methods that are assessed not to be specifically vulnerable to attack by any of—
(B)
a classical computer (as defined in that section).
(8)
PQC sandbox— The term PQC sandbox means a program for innovation and development with respect to the use of post-quantum cryptography in IT and OT applications for the electric grid that—
(A)
assembles relevant stakeholders, which may include operators of the bulk-power system, IT and OT vendors, relevant Federal agencies, relevant State and local organizations, and distribution utilities (as defined in section 217(a) of the Federal Power Act (
16 U.S.C. 824q(a)));
(B)
addresses challenges in PQC cybersecurity development and adoption;
(C)
prioritizes activities that support, encourage, or enable PQC integration into—
(i)
existing systems; and
(ii)
during the 5-year period beginning on the date of enactment of this Act, systems that are expected to be deployed within that 5-year period;
(D)
may include briefings, workshops, software challenges, hardware modeling, grid simulations, or red-teaming exercises; and
(E)
may be used to develop and test demonstrations, proofs of concept, interoperability between IT and OT systems, and pilot applications.
(9)
Reliability standard— The term reliability standard has the meaning given the term in section 215(a) of the Federal Power Act (
16 U.S.C. 824o(a)).
(10)
Secretary— The term Secretary means the Secretary of Energy, acting through the Office of Cybersecurity, Energy Security, and Emergency Response.